Neighborhoods › Jamaica › Building 4209597
Full demolition of 6-story building, est. $180K
165-25 Jamaica Avenue, Queens 02169 · Permit Entire
| Job | Q01370529 (4 filings: I1, S2, S3, S4) · Alteration |
|---|---|
| Category | demolition |
| Estimated cost | $180,000 |
| Scale | 6 → 6 stories; 3,000 sq ft |
| Work types | General Construction |
| Filed | Mar 22, 2026 |
| Professional | Bka Architects |
| Building | BIN 4209597 · BBL 4097950001 |
| Official record | DOB NOW job Q01370529 |
DOB description
Q01370529-I1: EXTERIOR WORK WILL BE LIMITED TO PAINT. TENANT BUILD OUT FOR A NEW FINE/FAST-CASUAL RESTAURANT WITH DINE-IN AND TAKE-AWAY SERVICES INCLUDING DEMOLITION AND GENERAL CONSTRUCTION WORK OF INTERIOR WALLS AND FINISHES. NO CHANGE TO USE, OCCUPANCY, OR EGRESS
Q01370529-S2: Installation of SCAV HVAC systems with electric heating coils and fully ducted distribution to serve the proposed architectural build-out for commercial tenant space including condensate disposal systems and automatic temperature controls, shown in plans.
Q01370529-S3: Plumbing work for commercial tenant fit-out as shown in plans.
Q01370529-S4: MAINTAIN EXISTING TEMPORARY LOOP DURING CONSTRUCTION OF THE TENANT FITOUT. NEW FULL SPRINKLER SYSTEM THROUGHOUT SPACE TIED IN TO EXISTING SPRINKLER MAIN. NEW SPRINKLER SYSTEM SHALL CONSIST OF NEW PIPE, VALVES, SPRINKLER HEADS AS SHOWN ON THESE DOCUMENTS
Status timeline
- Mar 22, 2026 — New job filed (Permit Entire) Q01370529-I1
- Mar 31, 2026 — New job filed (Permit Entire) Q01370529-S2
- Mar 31, 2026 — New job filed (Permit Entire) Q01370529-S3
- Mar 31, 2026 — New job filed (Permit Entire) Q01370529-S4
- Apr 1, 2026 — Permit issued — work can start (General Construction) Q01370529-I1
- Apr 5, 2026 — Permit issued — work can start (Sprinklers) Q01370529-S4
- Aug 14, 2026 — Permit issued — work can start (Permit Entire) Q01370529-I1
- Aug 17, 2026 — Permit issued — work can start (Mechanical Systems) Q01370529-S2
- Aug 18, 2026 — Permit issued — work can start (Permit Entire) Q01370529-S2
- Aug 26, 2026 — Permit issued — work can start (Permit Entire) Q01370529-S3
- Aug 26, 2026 — Permit issued — work can start (Permit Entire) Q01370529-S4
- Oct 13, 2026 — Permit expired (General Construction) Q01370529-I1
- Oct 13, 2026 — Permit expired (Mechanical Systems) Q01370529-S2
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| Q01370529-S2-MS | Mechanical Systems | Permit Issued | Aug 17, 2026 | Oct 13, 2026 |
| Q01370529-S4-EW-SP | Sprinklers | Permit Issued | Apr 5, 2026 | Dec 29, 2026 |
| Q01370529-S3-PL | Plumbing | Signed-off | Apr 2, 2026 | Nov 20, 2026 |
| Q01370529-I1-GC | General Construction | Permit Issued | Apr 1, 2026 | Oct 13, 2026 |