Neighborhoods › Midtown-Times Square › Building 1015264
Interior renovation: Interior general construction: install non-load-bearing…, est. $75K
525 Seventh Avenue, Manhattan 10018 · LOC Issued
| Job | M01367426 (2 filings: I1, S1) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $75,075 |
| Scale | 24 → 24 stories; 1,650 sq ft |
| Work types | General Construction |
| Filed | Mar 4, 2026 |
| Professional | Nta Design Group, Llc |
| Building | BIN 1015264 · BBL 1008140001 |
| Official record | DOB NOW job M01367426 |
DOB description
M01367426-I1: Interior General Construction: install non-load-bearing partitions, doors and frames, and finishes within existing space. No change to use, occupancy, egress, or floor area.
M01367426-S1: Install new rough plumbing and plumbing fixtures at partial 17th floors, including a pantry sink, dishwasher with indirect waste and vacuum break, and ejector pumps. Connect new piping to existing sanitary risers. No change in use, occupancy or egress.
Status timeline
- Mar 4, 2026 — New job filed (LOC Issued) M01367426-I1
- Mar 23, 2026 — New job filed (Approved) M01367426-S1
- Mar 27, 2026 — Plans approved (Approved) M01367426-S1
- Sep 25, 2026 — Job signed off (LOC Issued) M01367426-I1
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01367426-I1-GC | General Construction | Signed-off | Mar 11, 2026 | Mar 12, 2027 |
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.