Neighborhoods › Sheepshead Bay-Manhattan Beach-Gerritsen Beach › Building 3337295
Full demolition, est. $10M
2953 Avenue W, Brooklyn 10018 · Approved
| Job | B01351458 (2 filings: I1, S1) · Alteration |
|---|---|
| Category | demolition |
| Estimated cost | $10,263,000 |
| Scale | 60 → 60 dwelling units; 93,820 sq ft |
| Work types | Earthwork |
| Filed | Jun 15, 2026 |
| Professional | Sherwood Design Engineers |
| Building | BIN 3337295 · BBL 3073870001 |
| Official record | DOB NOW job B01351458 |
DOB description
B01351458-I1: As per HUB Consultation with Rami Bitar on 5/22/26, the job is to be reviewed by Central HUB Development. Job includes the demolition of existing Waste Yard, vehicular and pedestrian pavements, surface amenities and site elements, and landscaping. Job al
B01351458-S1: As per HUB Consultation with Rami Bitar on 5/22/26, the job is to be reviewed by Central HUB Development. Job includes drainage infrastructure such as trench drains, catch basins, manholes, and subsurface detention chambers. Job also includes new Waste
Status timeline
- Jun 15, 2026 — New job filed (Approved) B01351458-I1
- Jun 15, 2026 — New job filed (Approved) B01351458-S1
- Jun 24, 2026 — Plans approved (Approved) B01351458-I1
- Jun 30, 2026 — Plans approved (Approved) B01351458-S1
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.