Neighborhoods › Canarsie › Building 3331291
Full demolition, est. $3.7M
254 Stanley Avenue, Brooklyn 10018 · Approved
| Job | B01351437 (2 filings: I1, S1) · Alteration |
|---|---|
| Category | demolition |
| Estimated cost | $3,659,000 |
| Scale | 70 → 70 dwelling units; 104,000 sq ft |
| Work types | Earthwork |
| Filed | Jun 15, 2026 |
| Professional | Sherwood Design Engineers |
| Building | BIN 3331291 · BBL 3081580001 |
| Official record | DOB NOW job B01351437 |
DOB description
B01351437-I1: As per HUB Consultation with Rami Bitar on 5/22/26, the job is to be reviewed by Central HUB Development. Job includes the demolition of existing Waste Yard, vehicular and pedestrian pavements, surface amenities and site elements, and landscaping. Job
B01351437-S1: As per HUB Consultation with Rami Bitar on 5/22/26, the job is to be reviewed by Central HUB Development. Job includes drainage infrastructure such as trench drains, catch basins, manholes, and subsurface detention chambers.
Status timeline
- Jun 15, 2026 — New job filed (Approved) B01351437-I1
- Jun 15, 2026 — New job filed (Approved) B01351437-S1
- Jun 22, 2026 — Plans approved (Approved) B01351437-I1
- Jun 22, 2026 — Plans approved (Approved) B01351437-S1
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.