Neighborhoods › Mapleton-Midwood (West) › Building 3172071
Facade/scaffold work: Remove existing roofing systems and replace with new.…, est. $18M
6006 23 Avenue, Brooklyn 11101 · Approved
| Job | B01323266 (4 filings: I1, S3, S2, S1) · Alteration |
|---|---|
| Category | facade/scaffold |
| Estimated cost | $17,500,000 |
| Scale | 4 → 4 stories; 3,500 sq ft |
| Work types | General Construction, Structural |
| Filed | Feb 4, 2026 |
| Professional | Aisa Osako |
| Building | BIN 3172071 · BBL 3065490024 |
| Official record | DOB NOW job B01323266 |
DOB description
B01323266-I1: Remove existing roofing systems and replace with new. Replace existing parapets, masonry repairs, flood elimination, windows replacement throughout and exterior doors replacement. Steel lintels over windows.
B01323266-S3: Structural work to the school building Remove & replace existing Exterior concrete Ramp and stairs.
B01323266-S2: Remove & replace (5) 3 inch Roof drains , (5) 4 inch Roof drains and (3) 5 inch roof Drains And relocate (4) 3 inch roof drains.
B01323266-S1: 1 Split a/c unit in Telecom room, provide 5 new gravity ventilator's, 1 penthouse louver, insulate piping and ductwork. Provide 1 new exhaust fan.
Status timeline
- Feb 4, 2026 — New job filed (Approved) B01323266-I1
- Feb 4, 2026 — New job filed (Approved) B01323266-S1
- Feb 4, 2026 — New job filed (Approved) B01323266-S2
- Feb 5, 2026 — New job filed (Approved) B01323266-S3
- Apr 6, 2026 — Plans approved (Approved) B01323266-S2
- Apr 6, 2026 — Plans approved (Approved) B01323266-S3
- Apr 6, 2026 — Plans approved (Approved) B01323266-S1
- Apr 6, 2026 — Plans approved (Approved) B01323266-I1
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.