Neighborhoods › Gravesend (South) › Building 3186454
Interior renovation: Remove turf, pavement, fencing, concrete pavement…, est. $11M
2630 Benson Avenue, Brooklyn 10005 · Approved
| Job | B01313853 (3 filings: I1, S1, S2) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $11,061,105 |
| Scale | 4 → 4 stories; 186,780 sq ft |
| Work types | General Construction, Structural, Foundation, Earthwork |
| Filed | Nov 17, 2025 |
| Professional | the Rba Group |
| Building | BIN 3186454 · BBL 3068830001 |
| Official record | DOB NOW job B01313853 |
DOB description
B01313853-I1: Remove turf, pavement, fencing, concrete pavement, handrails, fieldhouse bathrm. partitions, flooring & fixtures & replace with new. Excavation/trench for new site drainage & MEP conduits. Install storm management systems/drainage structures & sport lghts
B01313853-S1: Remove selected ex. drain structures. Install new storm management systems & site drainage structures to capture water at area of disturbance. Install water treatment systems at each storm management systems. Provide 2 new site connections to city system
B01313853-S2: Removal of some ex. bathroom fixtures at Field House and 3 ex. drinking fountains including base/footings. Install new accessible plumbing fixtures at reconstructed unisex bathroom at Field House and install 4 new drinking fountains at sports field
Status timeline
- Nov 17, 2025 — New job filed (Approved) B01313853-I1
- Nov 17, 2025 — New job filed (Approved) B01313853-S1
- Nov 17, 2025 — New job filed (Approved) B01313853-S2
- Dec 15, 2025 — Plans approved (Approved) B01313853-S1
- Apr 13, 2026 — Plans approved (Approved) B01313853-S2
- Apr 14, 2026 — Plans approved (Approved) B01313853-I1
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.