NYC Permit AlertsBy BuildPermitGuide

Neighborhoods › Crown Heights (South) › Building 3034075

Full demolition of 1-story building, est. $1.3M

1650 Bedford Avenue, Brooklyn 10001 · Approved

JobB01306112 (5 filings: I1, S2, S1, S3, S4) · Alteration
Categorydemolition
Estimated cost$1,299,986
Scale1 → 1 stories; 6,385 sq ft
Work typesGeneral Construction
FiledJan 21, 2026
ProfessionalIkon.5 Architects
BuildingBIN 3034075 · BBL 3012940001
Official recordDOB NOW job B01306112

DOB description

B01306112-I1: Filing for general construction associated with the demolition and reconstruction of the existing courtyard at Medgar Evers College (CUNY), including a new steel-framed fabric canopy, handrails, ramps, and raised platforms per plans.
B01306112-S2: Herewith Filing for the installation of a Steel-Framed Fabric Canopy as per plans.
B01306112-S1: Herewith filing foundation work in conjunction with the installation of a new steel-framed fabric canopy.
B01306112-S3: Herewith Filing Plumbing Work in connection with courtyard renovations, work proposed is part of the irrigation system as per plans filed herewith.
B01306112-S4: Herewith filing for Underground Plumbing in connection with the CUNY Medgar Evers Courtyard renovations. The scope of work includes the installation of planter drains, area drains and related storm/ Drainage piping, as per plans.

Status timeline

Map

Watch this block

Get an email when the next job is filed within 100 ft of this address. Free, weekly.