Neighborhoods › Bedford-Stuyvesant (West) › Building 3051606
Enlargement, est. $842K
227 Putnam Avenue, Brooklyn 11231 · Approved
| Job | B01303542 (5 filings: I1, S1, S3, S2, S4) · Alteration CO |
|---|---|
| Category | vertical enlargement |
| Estimated cost | $842,160 |
| Scale | 4 → 4 stories; 1 → 2 dwelling units; 2,904 sq ft |
| Work types | General Construction |
| Filed | Oct 20, 2025 |
| Professional | William Penner Architect |
| Building | BIN 3051606 · BBL 3018220093 |
| Official record | DOB NOW job B01303542 |
DOB description
B01303542-I1: Repair existing wood frame building damaged due to fire. Legalize 3rd floor enlargement per approved Pre-Determination application. Create Basement dwelling unit in 2-family building.
B01303542-S1: Partial demolition of existing 2nd Floor, 3rd Floor, and Roof due to previous fire damage and excessive settlement. Construct new cmu bearing walls at Basement Level and wood framed structure from 1st Floor to Roof. Modify rear steel deck.
B01303542-S3: Filing herewith plumbing work for interior renovation at the address noted. No change in use, egress, or occupancy.
B01303542-S2: New Heat Pump and Ventilation equipment and ductwork throughout.
B01303542-S4: New wet pipe sprinkler throughout.
Status timeline
- Oct 20, 2025 — New job filed (Approved) B01303542-I1
- Dec 3, 2025 — New job filed (Approved) B01303542-S1
- Apr 19, 2026 — New job filed (Approved) B01303542-S3
- Apr 19, 2026 — New job filed (Approved) B01303542-S4
- Apr 21, 2026 — New job filed (Approved) B01303542-S2
- Aug 7, 2026 — Plans approved (Approved) B01303542-I1
- Aug 24, 2026 — Plans approved (Approved) B01303542-S3
- Aug 31, 2026 — Plans approved (Approved) B01303542-S2
- Sep 2, 2026 — Plans approved (Approved) B01303542-S4
- Sep 15, 2026 — Plans approved (Approved) B01303542-S1
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.