Neighborhoods › Mapleton-Midwood (West) › Building 3170899
New 2-story building, 1 unit, est. $2.2M
1063 East 7 Street, Brooklyn 10001 · Approved
| Job | B01252842 (9 filings: P1, P2, S3, S4, S5, S1, S2, S6, S7) · ALT-CO - New Building with Existing Elements to Remain |
|---|---|
| Category | new building |
| Estimated cost | $2,247,600 |
| Scale | 2 → 2 stories; 1 → 1 dwelling units; 7,492 sq ft |
| Work types | General Construction |
| Filed | Jul 20, 2026 |
| Professional | J.L.Ramirez Architects Pc |
| Building | BIN 3170899 · BBL 3065200061 |
| Official record | DOB NOW job B01252842 |
DOB description
B01252842-P1: ALTERATION AND ENLARGEMENT OF EXISTING SINGLE-FAMILY RESIDENCE 2 STORY BRICK BUILDING WITH ATTIC AND CELLAR
B01252842-P2: subsequent filing in conjunction with Alteration (GC) filing.
B01252842-S3: subsequent filing in conjunction with Alteration (GC) filing.
B01252842-S4: All new mechanical work is proposed under this application which includes: installation of new heat pumps, ERV system and ventilation equipment along with refrigerant piping and ductwork
B01252842-S5: All new plumbing work is proposed under this application which includes: Domestic water distribution, sanitary system & storm water system.
B01252842-S1: subsequent filing for SOE work in conjunction with alteration application
B01252842-S2: subsequent filing for foundation and earthwork in conjunction with Alteration (GC) application.
B01252842-S6: All new wet system sprinkler work is proposed under this application per architectural floor drawings.
B01252842-S7: subsequent filing for structural work in conjunction with alteration (GC) filing
Status timeline
- Nov 3, 2025 — New job filed (Objections) B01252842-S4
- Nov 3, 2025 — New job filed (Approved) B01252842-S5
- Nov 3, 2025 — New job filed (Approved) B01252842-S6
- Dec 2, 2025 — Plans approved (Approved) B01252842-S6
- Jan 5, 2026 — New job filed (Permit Entire) B01252842-S3
- Jan 6, 2026 — New job filed (Permit Entire) B01252842-S1
- Jan 6, 2026 — New job filed (Permit Entire) B01252842-S2
- Jan 6, 2026 — New job filed (Permit Entire) B01252842-S7
- Jun 9, 2026 — Permit issued — work can start (Support of Excavation) B01252842-S1
- Jun 9, 2026 — Permit issued — work can start (Structural) B01252842-S3
- Jun 9, 2026 — Permit issued — work can start (Foundation) B01252842-S7
- Jun 10, 2026 — Permit issued — work can start (Permit Entire) B01252842-S1
- Jun 10, 2026 — Permit issued — work can start (Permit Entire) B01252842-S7
- Jun 22, 2026 — Permit issued — work can start (Earth Work) B01252842-S2
- Jun 23, 2026 — Permit issued — work can start (Permit Entire) B01252842-S2
- Jul 20, 2026 — New job filed (Approved) B01252842-P1
- Jul 24, 2026 — Plans approved (Approved) B01252842-P1
- Jul 30, 2026 — New job filed (Approved) B01252842-P2
- Aug 13, 2026 — Plans approved (Approved) B01252842-P2
- Aug 13, 2026 — Permit issued — work can start (Permit Entire) B01252842-S3
- Sep 11, 2026 — Plans approved (Approved) B01252842-S5
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| B01252842-S2-FO-EA | Earth Work | Permit Issued | Jun 22, 2026 | Nov 19, 2026 |
| B01252842-I1-GC | General Construction | Permit Issued | Jun 9, 2026 | Nov 19, 2026 |
| B01252842-S1-SE | Support of Excavation | Permit Issued | Jun 9, 2026 | Nov 19, 2026 |
| B01252842-S3-ST | Structural | Permit Issued | Jun 9, 2026 | Nov 19, 2026 |
| B01252842-S7-FO | Foundation | Permit Issued | Jun 9, 2026 | Nov 19, 2026 |
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.