Neighborhoods › Highbridge › Building 2003519
Full demolition, est. $640K
1257 Ogden Avenue, Bronx 07081 · Plan Examiner Review
| Job | X01420399 (5 filings: I1, S2, S3, S1, S4) · Alteration |
|---|---|
| Category | demolition |
| Estimated cost | $640,000 |
| Work types | Plumbing |
| Filed | Jul 20, 2026 |
| Professional | Keri Engineering, P.C. |
| Building | BIN 2003519 · BBL 2025290081 |
| Official record | DOB NOW job X01420399 |
DOB description
X01420399-I1: DEMOLISH AND REMOVE THREE (3) DOMESTIC WATER SERVICES WITH SPRINKLER TAPS, INCLUDING GATE VALVES,ASSOCIATED PIPING, CURB VALVES, PIPING ANDPIPING SPECIALTIES AND REPLACE WITH NEW. PROVIDE NEW FLOOR DRAIN. PROVIDE NEW LEAK DETECTION.
X01420399-S2: Support new water service connections
X01420399-S3: Removal and capping of existing water services. New water service connections including wet tap, and curb valves.
X01420399-S1: REMOVE A TOTAL OF SIXTEEN (16) EXISTING SPRINKLER HEADS IN THE BASEMENT WORKROOM, PAINT ROOM, KITCHEN STORAGE, ANDSTORAGE ROOM 101 AND REPLACE THEM WITH NEW.
X01420399-S4: Remove and provide new concrete for new booster pump pad, under slab piping work, and new floor drain.
Status timeline
- Jul 20, 2026 — New job filed (Plan Examiner Review) X01420399-I1
- Jul 20, 2026 — New job filed (Plan Examiner Review) X01420399-S1
- Aug 13, 2026 — New job filed (Approved) X01420399-S2
- Aug 13, 2026 — New job filed (Plan Examiner Review) X01420399-S3
- Sep 15, 2026 — New job filed (Plan Examiner Review) X01420399-S4
- Oct 6, 2026 — Plans approved (Approved) X01420399-S2
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.