Neighborhoods › Fordham Heights › Building 2011054
Enlargement, est. $13K
2400 Marion Avenue, Bronx 10018 · Approved
| Job | X01402230 (4 filings: I1, P2, P3, S1) · Alteration |
|---|---|
| Category | vertical enlargement |
| Estimated cost | $12,500 |
| Scale | 6 → 6 stories; 100 sq ft |
| Work types | General Construction |
| Filed | Aug 10, 2026 |
| Professional | Eme Consulting Eng and Arch Group |
| Building | BIN 2011054 · BBL 2030240021 |
| Official record | DOB NOW job X01402230 |
DOB description
X01402230-I1: Removal of (1) existing vertical platform lift and installation of (1) new vertical platform lift. Patch and repair existing finishes affected by the installation of the new lift.
X01402230-P2: Removal of (1) existing vertical platform lift and installation of (1) new vertical platform lift. Patch and repair existing finishes affected by the installation of the new lift.
X01402230-P3: Removal of (1) existing vertical platform lift and installation of (1) new vertical platform lift. Patch and repair existing finishes affected by the installation of the new lift.
X01402230-S1: PROVIDE STRUCTURAL WORK FOR THE NEW PLATFORM LIFT, INCLUDING STEEL FRAMING FOR EXTENDED PLATFORM LANDING, LIGHT-WEIGHT CONCRETE INFILL FOR LIFT PIT, AND NEW CMU BLOCK WALL.
Status timeline
- Aug 10, 2026 — New job filed (Approved) X01402230-I1
- Aug 10, 2026 — New job filed (Approved) X01402230-S1
- Aug 27, 2026 — Plans approved (Approved) X01402230-S1
- Sep 3, 2026 — New job filed (Approved) X01402230-P2
- Sep 11, 2026 — Plans approved (Approved) X01402230-P2
- Sep 20, 2026 — New job filed (Approved) X01402230-P3
- Sep 29, 2026 — Plans approved (Approved) X01402230-P3
- Sep 29, 2026 — Plans approved (Approved) X01402230-I1