NYC Permit AlertsBy BuildPermitGuide

Neighborhoods › Melrose › Building 2001758

Interior renovation: Moderate rehab of entire building to include direct…, est. $586K

370 East 159 Street, Bronx 11501 · Objections

JobX01363184 (6 filings: I1, S1, S4, S3, S2, S5) · Alteration
Categoryinterior renovation
Estimated cost$585,800
Scale3 → 3 stories; 4 → 4 dwelling units; 7,300 sq ft
Work typesGeneral Construction
FiledSep 30, 2026
ProfessionalSlm Architecture, P.C.
BuildingBIN 2001758 · BBL 2024050013
Official recordDOB NOW job X01363184

DOB description

X01363184-I1: MODERATE REHAB OF ENTIRE BUILDING TO INCLUDE DIRECT REPLACEMENT OF FINISHES, KITCHEN CABINETS AND COUNTER TOP, BATHROOMS (FIXTURES FILED SEPARATELY), DOORS AND WINDOWS. REMOVE AND REPLACE BUILDING ENTRANCE & VESTIBULE AND SKYLIGHT AS PER PLANS FILED.
X01363184-S1: REMOVE & REPLACE DAMAGED OR DETERIORATED VINYL SIDING, ROOF ASSEMBLY, PARAPET, NEW TERRA-COTTA COPING, SEALANT/CAULK JOINTS AT STONE & MASONRY AND REPLACE SILL AS PER PLANS FILED.
X01363184-S4: REPLACEMENT OF EXHAUST GRILLES AND ROOFTOP EXHAUST FANS. INSTALLATION OF NEW SMART INSULATED RADIATOR COVERS. REPAIR AND REPLACEMENT OF HEATING PIPING AND ASSOCIATED VALVES. INSTALLATION OF NEW VENT PIPING FOR HEATING BOILER AND DOMESTIC WATER HEATER
X01363184-S3: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN. REPLACEMENT OF EXISTING CELLAR FIXTURES.
X01363184-S2: STRUCTURAL WORK IS TO PROBE AREAS WITHIN THE CELLAR CEILING FOR CRACKS AND VOIDS AND TO DETERMINE STRUCTURAL OR WATER DAMAGE TO CEILINGS WITHIN APTS. 1st THRU 3rd FLOORS AS INDICATED ON PLANS. ALSO PARGE AND RE-POINTING OF STONE WALLS AT CELLAR.
X01363184-S5: REPLACEMENT OF GAS FIRED HOT WATER HEATER AND BOILER WITH ASSOCIATED EQUIPMENT

Status timeline

Map

Watch this block

Get an email when the next job is filed within 100 ft of this address. Free, weekly.