Neighborhoods › Morrisania › Building 2001200
Interior renovation: Moderate rehab of entire bldg to include direct…, est. $1.2M
877 Brook Avenue, Bronx 11501 · Objections
| Job | X01363175 (7 filings: I1, S1, S4, S3, S5, S6, S2) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $1,163,950 |
| Scale | 5 → 5 stories; 10 → 10 dwelling units; 7,800 sq ft |
| Work types | General Construction |
| Filed | Sep 30, 2026 |
| Professional | Slm Architecture, P.C. |
| Building | BIN 2001200 · BBL 2023650025 |
| Official record | DOB NOW job X01363175 |
DOB description
X01363175-I1: MODERATE REHAB OF ENTIRE BLDG TO INCLUDE DIRECT REPLACEMENT OF FINISHES, KITCHEN CABINETS & COUNTER TOP, BATHROOMS (FIXT. FILED SEPARATELY), INTERIOR AND EXTERIOR DOORS & WINDOWS. REMOVE & REPLACE BLDG ENTRANCE & VESTIBULE.
X01363175-S1: FACADE RESTORATION, REMOVE & REPLACE ROOF ASSEMBLY, NEW TERRA-COTTA COPING, EXTERIOR STEEL STAIR & HANDRAIL, SEALANT/CAULK JOINTS AT STONE & MASONRY AND REPLACE SILL & CORNICE AS PER PLANS FILED.
X01363175-S4: REPLACEMENT OF EXHAUST GRILLES AND ROOFTOP EXHAUST FANS. INSTALLATION OF NEW SMART INSULATED RADIATOR COVERS. REPAIR AND REPLACEMENT OF HEATING PIPING AND ASSOCIATED VALVES. INSTALLATION OF NEW VENT PIPING FOR HEATING BOILER AND DOMESTIC WATER HEATERS.
X01363175-S3: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN. REPLACEMENT OF EXISTING CELLAR FIXTURES.
X01363175-S5: REPLACEMENT OF EXISTING CENTRAL HYDRONIC BOILERS. REPAIR AND REPLACEMENT OF ASSOCIATED EQUIPMENT.
X01363175-S6: REPLACEMENT OF NATURAL GAS FIRED WATER HEATER AND ASSOCIATED EQUIPMENT.
X01363175-S2: STRUCTURAL WORK IS TO PROBE AREAS WITHIN THE CELLAR CEILING FOR CRACKS AND VOIDS AND TO DETERMINE STRUCTURAL OR WATER DAMAGE TO CEILINGS WITHIN APTS. 2nd THRU 5th FLOORS AS INDICATED ON PLANS. ALSO PARGE AND RE-POINTING OF STONE WALLS AT CELLAR.
Status timeline
- Sep 30, 2026 — New job filed (Objections) X01363175-I1
- Oct 1, 2026 — New job filed (Approved) X01363175-S3
- Oct 1, 2026 — New job filed (Approved) X01363175-S5
- Oct 4, 2026 — New job filed (Plan Examiner Review) X01363175-S1
- Oct 4, 2026 — New job filed (Chief Plan Examiner/ Assistant Chief Plan Examiner Review) X01363175-S4
- Oct 4, 2026 — New job filed (Chief Plan Examiner/ Assistant Chief Plan Examiner Review) X01363175-S6
- Oct 5, 2026 — New job filed (Chief Plan Examiner/ Assistant Chief Plan Examiner Review) X01363175-S2
- Oct 14, 2026 — Plans approved (Approved) X01363175-S5
- Oct 14, 2026 — Plans approved (Approved) X01363175-S3
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.