Neighborhoods › Morrisania › Building 2091165
Interior renovation: Moderate rehab of entire bldg to include direct…, est. $953K
885 Brook Avenue, Bronx 11501 · Objections
| Job | X01363174 (7 filings: I1, S1, S3, S4, S6, S5, S2) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $952,600 |
| Scale | 4 → 4 stories; 7 → 7 dwelling units; 7,612 sq ft |
| Work types | General Construction |
| Filed | Sep 30, 2026 |
| Professional | Slm Architecture, P.C. |
| Building | BIN 2091165 · BBL 2023650020 |
| Official record | DOB NOW job X01363174 |
DOB description
X01363174-I1: MODERATE REHAB OF ENTIRE BLDG TO INCLUDE DIRECT REPLACEMENT OF FINISHES, KITCHEN CABINETS & COUNTER TOP, BATHROOMS (FIXT. FILED SEPARATELY), INTERIOR AND EXTERIOR DOORS & WINDOWS. REMOVE & REPLACE BLDG ENTRANCE & VESTIBULE.
X01363174-S1: FACADE RESTORATION, REMOVE & REPLACE ROOF ASSEMBLY, NEW TERRA-COTTA COPING, EXTERIOR STEEL STAIR & HANDRAIL, SEALANT/CAULK JOINTS AT STONE & MASONRY AND REPLACE SILL & CORNICE AS PER PLANS FILED.
X01363174-S3: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN. REPLACEMENT OF CELLAR FIXTURES.
X01363174-S4: REPLACEMENT OF EXHAUST GRILLES AND ROOFTOP EXHAUST FANS. INSTALLATION OF NEW SMART INSULATED RADIATOR COVERS. REPAIR AND REPLACEMENT OF HEATING PIPING AND ASSOCIATED VALVES. INSTALLATION OF NEW VENT PIPING FOR HEATING BOILER AND DOMESTIC WATER HEATERS.
X01363174-S6: REPLACEMENT OF NATURAL GAS FIRED WATER HEATER AND ASSOCIATED EQUIPMENT.
X01363174-S5: REPLACE EXISTING BOILERS AT CELLAR WITH NEW AT EXISTING BOILER ROOM AS PER PLANS FILED.
X01363174-S2: STRUCTURAL WORK IS TO PROBE AREAS WITHIN THE CELLAR CEILING FOR CRACKS AND VOIDS AND TO DETERMINE STRUCTURAL OR WATER DAMAGE TO CEILINGS WITHIN APTS. 1st THRU 5th FLOORS AS INDICATED ON PLANS. ALSO PARGE AND RE-POINTING OF STONE WALLS AT CELLAR.
Status timeline
- Sep 30, 2026 — New job filed (Objections) X01363174-I1
- Oct 1, 2026 — New job filed (Approved) X01363174-S3
- Oct 1, 2026 — New job filed (Approved) X01363174-S5
- Oct 4, 2026 — New job filed (Plan Examiner Review) X01363174-S1
- Oct 4, 2026 — New job filed (Chief Plan Examiner/ Assistant Chief Plan Examiner Review) X01363174-S4
- Oct 4, 2026 — New job filed (Chief Plan Examiner/ Assistant Chief Plan Examiner Review) X01363174-S6
- Oct 5, 2026 — New job filed (Chief Plan Examiner/ Assistant Chief Plan Examiner Review) X01363174-S2
- Oct 14, 2026 — Plans approved (Approved) X01363174-S5
- Oct 14, 2026 — Plans approved (Approved) X01363174-S3
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.