Neighborhoods › Claremont Village-Claremont (East) › Building 2004215
Interior renovation: Moderate rehab of entire bldg to include direct…, est. $2.3M
1195 Fulton Avenue, Bronx 11501 · Chief Plan Examiner/ Assistant Chief Plan Examiner Review
| Job | X01362862 (7 filings: I1, S1, S4, S3, S5, S6, S2) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $2,299,998 |
| Scale | 5 → 5 stories; 20 → 20 dwelling units; 13,500 sq ft |
| Work types | General Construction |
| Filed | Sep 30, 2026 |
| Professional | Slm Architecture, P.C. |
| Building | BIN 2004215 · BBL 2026090039 |
| Official record | DOB NOW job X01362862 |
DOB description
X01362862-I1: MODERATE REHAB OF ENTIRE BLDG TO INCLUDE DIRECT REPLACEMENT OF FINISHES, KITCHEN CABINETS & COUNTER TOP, BATHROOMS (FIXT. FILED SEPARATELY), INTERIOR AND EXTERIOR DOORS & WINDOWS. REMOVE & REPLACE BLDG ENTRANCE & VESTIBULE, SKYLIGHT.
X01362862-S1: FACADE RESTORATION, REMOVE & REPLACE ROOF ASSEMBLY, PARAPET, NEW TERRA-COTTA COPING, EXTERIOR STEEL STAIR & HANDRAIL, SEALANT/CAULK JOINTS AT STONE & MASONRY AND REPLACE SILL & CORNICE AS PER PLANS FILED.
X01362862-S4: REPLACEMENT OF EXHAUST GRILLES AND ROOFTOP EXHAUST FANS. INSTALLATION OF NEW SMART INSULATED RADIATOR COVERS. REPAIR AND REPLACEMENT OF HEATING PIPING AND ASSOCIATED VALVES. INSTALLATION OF NEW VENT PIPING FOR HEATING BOILER AND DOMESTIC WATER HEATERS.
X01362862-S3: REPLACEMENT OF EXISTING KITCHEN AND BATHROOM FIXTURES ON EXISTING ROUGH IN. REPLACEMENT OF EXISTING BASEMENT FIXTURES.
X01362862-S5: REPLACEMENT OF EXISTING CENTRAL STEAM BOILERS. REPAIR AND REPLACEMENT OF ASSOCIATED EQUIPMENT.
X01362862-S6: REPLACEMENT OF NATURAL GAS FIRED WATER HEATER AND ASSOCIATED EQUIPMENT.
X01362862-S2: STRUCTURAL WORK IS TO PROBE AREAS WITHIN THE BASEMENT CEILING FOR CRACKS AND VOIDS AND TO DETERMINE STRUCTURAL OR WATER DAMAGE TO CEILINGS WITHIN APTS. 1st THRU 5th FLOORS AS INDICATED ON PLANS. ALSO PARGE AND RE-POINTING OF STONE WALLS AT BASEMENT
Status timeline
- Sep 30, 2026 — New job filed (Chief Plan Examiner/ Assistant Chief Plan Examiner Review) X01362862-I1
- Oct 1, 2026 — New job filed (Objections) X01362862-S3
- Oct 1, 2026 — New job filed (Objections) X01362862-S5
- Oct 4, 2026 — New job filed (Chief Plan Examiner/ Assistant Chief Plan Examiner Review) X01362862-S1
- Oct 4, 2026 — New job filed (Chief Plan Examiner/ Assistant Chief Plan Examiner Review) X01362862-S4
- Oct 4, 2026 — New job filed (Chief Plan Examiner/ Assistant Chief Plan Examiner Review) X01362862-S6
- Oct 5, 2026 — New job filed (Chief Plan Examiner/ Assistant Chief Plan Examiner Review) X01362862-S2
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.