Neighborhoods › Melrose › Building 2130504

Interior renovation: Nterior renovation of building lobby at west end of 1st…, est. $125K

425 Westchester Avenue, Bronx 10001 · Permit Entire

JobX01324710 (9 filings: I1, P5, P8, S3, P2, P7, S1, P3, S2) · Alteration
Categoryinterior renovation
Estimated cost$125,000
Scale10 → 10 stories; 3,000 sq ft
Work typesGeneral Construction
FiledDec 29, 2025
ProfessionalMatiz Architecture and Design
BuildingBIN 2130504 · BBL 2023627501
Official recordDOB NOW job X01324710

DOB description

X01324710-I1: NTERIOR RENOVATION OF BUILDING LOBBY AT WEST END OF 1ST FLOOR AND ENTIRE AREAS ON 7TH, 8TH & 9TH FLOORS AS INDICATED ON PLANS.
X01324710-P5: REMOVAL OF EXISTING SPRINKLER SYSTEMS ON FLOORS 7, 8 & 9, AND INSTALLATION OF NEW SPRINKLER SYSTEMS FOR THE REVISED AREAS OF THE 7TH, 8TH, & 9TH FLOORS. INSTALLATION OF TEMPORARY SPRINKLER PROTECTION DURING CONSTRUCTION, AND REMOVAL OF TEMPORARY SPRINKLER
X01324710-P8: REMOVAL OF EXISTING SPRINKLER SYSTEMS ON FLOORS 7, 8 & 9, AND INSTALLATION OF NEW SPRINKLER SYSTEMS FOR THE REVISED AREAS OF THE 7TH, 8TH, & 9TH FLOORS. INSTALLATION OF TEMPORARY SPRINKLER PROTECTION DURING CONSTRUCTION, AND REMOVAL OF TEMPORARY SPRINKLER
X01324710-S3: REMOVAL OF EXISTING SPRINKLER SYSTEMS ON FLOORS 7, 8 & 9, AND INSTALLATION OF NEW SPRINKLER SYSTEMS FOR THE REVISED AREAS OF THE 7TH, 8TH, & 9TH FLOORS. INSTALLATION OF TEMPORARY SPRINKLER PROTECTION DURING CONSTRUCTION, AND REMOVAL OF TEMPORARY SPRINKLER
X01324710-P2: NTERIOR RENOVATION OF BUILDING LOBBY AT WEST END OF 1ST FLOOR AND ENTIRE AREAS ON 7TH, 8TH & 9TH FLOORS AS INDICATED ON PLANS.
X01324710-P7: ADJUST EXISTING MECHANICAL SYSTEMS ON LEVELS LOBBY, 7,8 & 9 TO NEW ZETA SCHOOLBACKGROUNDS. NEW MECHANICAL EQUIPMENT TO BE PROVIDED TO COVER THE REMAINDER OF THE LOAD REQUIREMENTS. NEW ENERGY RECOVERY VENTILATORS TO BE PROVIDED ON LEVEL 10.
X01324710-S1: ADJUST EXISTING MECHANICAL SYSTEMS ON LEVELS LOBBY, 7,8 & 9 TO NEW ZETA SCHOOLBACKGROUNDS. NEW MECHANICAL EQUIPMENT TO BE PROVIDED TO COVER THE REMAINDER OF THE LOAD REQUIREMENTS. NEW ENERGY RECOVERY VENTILATORS TO BE PROVIDED ON LEVEL 10.
X01324710-P3: RENOVATING 7,8, & 9 FLOORS IN AN EXISTING BUILDING. NEW PLUMBING SYSTEM FOR RENOVATED BATHROOMS AND ART ROOM.
X01324710-S2: RENOVATING 7,8, & 9 FLOORS IN AN EXISTING BUILDING. NEW PLUMBING SYSTEM FOR RENOVATED BATHROOMS AND ART ROOM.

Status timeline

Work permits

PermitWorkStatusIssuedExpires
X01324710-S1-MSMechanical SystemsSigned-offFeb 2, 2026Feb 3, 2027
X01324710-S2-PLPlumbingPermit IssuedJan 21, 2026Feb 8, 2027
X01324710-S3-EW-SPSprinklersPermit IssuedJan 19, 2026Feb 8, 2027
X01324710-I1-GCGeneral ConstructionSigned-offJan 6, 2026Jan 7, 2027