NYC Permit AlertsBy BuildPermitGuide

Neighborhoods › University Heights (South)-Morris Heights › Building 2094683

Interior renovation: Ps 091x: general construction architectural work…, est. $13M

2170 Aqueduct Avenue, Bronx 10001 · Approved

JobX01312701 (4 filings: I1, S1, S3, S2) · Alteration
Categoryinterior renovation
Estimated cost$13,030,704
Scale4 → 4 stories; 31,938 sq ft
Work typesGeneral Construction
FiledNov 5, 2025
ProfessionalCta Architects P.C.
BuildingBIN 2094683 · BBL 2032070040
Official recordDOB NOW job X01312701

DOB description

X01312701-I1: PS 091X: General construction architectural work associated to a ventilation project for an existing school building.
X01312701-S1: PA 091X: Removal of floor mounted unit ventilators, radiators and associated piping. Installation of new air-cooled chiller, new unit ventilators, new floor mounted unit ventilators, new steam fin-tube radiation and all associated piping.
X01312701-S3: PS 091X: New steel dunnage platforms and screen, new framing for new penetrations on all floors; new exterior wall penetrations; new concrete pads on each floor; new electrical room structural ceiling in cellar and supporting CMU walls and deck.
X01312701-S2: PS 091-X: Removal of unused gas pipes, hose bib, cold water pipe. Reroute gas pipe and cold-water pipe to prevent them from remaining in the new electrical room. Provide new NFWH and 3/4" cold water pipeline.

Status timeline

Map

Watch this block

Get an email when the next job is filed within 100 ft of this address. Free, weekly.