NYC Permit AlertsBy BuildPermitGuide

Neighborhoods › Mount Hope › Building 2013663

Facade/scaffold work: Temporary runback structure in connection with hoist…, est. $10K

2055 Ryer Avenue, Bronx 33950 · Permit Entire

JobX01204352 (5 filings: S1, P1, P2, P3, P4) · Alteration
Categoryfacade/scaffold
Estimated cost$10,000
Work typesProtection & Mechanical Methods
FiledApr 29, 2026
ProfessionalPaul G. Jones, P.E
BuildingBIN 2013663 · BBL 2031560068
Official recordDOB NOW job X01204352

DOB description

X01204352-S1: TEMPORARY RUNBACK STRUCTURE IN CONNECTION WITH HOIST FILING # X01206076-P2-VT
X01204352-P1: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X01204352-P2: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X01204352-P3: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.
X01204352-P4: INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AND MEDIUM DUTY PIPE SCAFFOLD AS PER DRAWINGS DURING NEW BUILDING WORK. NO CHANGE IN USE, EGRESS AND OCCUPANCY. SIDEWALK SHED AND PIPE SCAFFOLD TO COMPLY WITH CHAPTER 33 OF THE NYC BUILDING CODE OF 2022.

Status timeline

Work permits

PermitWorkStatusIssuedExpires
X01204352-S1-PMMProtection and Mechanical MethodsPermit IssuedApr 30, 2026May 1, 2027
X01204352-I1-SFSidewalk ShedPermit IssuedApr 21, 2026Apr 22, 2027
X01204352-I1-SHSidewalk ShedPermit IssuedApr 21, 2026Dec 23, 2026

Map

Watch this block

Get an email when the next job is filed within 100 ft of this address. Free, weekly.