Neighborhoods › Highbridge › Building 2003495
Sign or curb cut: Addition of new elevator, toilet renovations, partitions…, est. $4.9M
175 West 166 Street, Bronx 11747 · Objections
| Job | X00851565 (5 filings: P1, P3, P4, P2, S4) · Alteration |
|---|---|
| Category | sign/curb cut |
| Estimated cost | $4,920,000 |
| Scale | 2 → 2 stories; 38,000 sq ft |
| Work types | General Construction |
| Filed | Sep 8, 2026 |
| Professional | H2m Architects + Engineers |
| Building | BIN 2003495 · BBL 2025260083 |
| Official record | DOB NOW job X00851565 |
DOB description
X00851565-P1: Addition of new elevator, toilet renovations, partitions, interior finish repairs, interior door replacements, signage
X00851565-P3: Plumbing fixtures and piping for toilet room upgrades
X00851565-P4: Upgrades to toilet and room ventilation, fan replacements, room ventilation
X00851565-P2: Structural work to provide new elevator shaft, foundations and roof bulkhead. Excavation of rock to provide foundations. Limited number of loose lintels and duct shaft openings.
X00851565-S4: Provide new sprinkler heads in the elevator shaft pit and top of hoist way. Remove heads in room in basement
Status timeline
- Sep 8, 2026 — New job filed (Objections) X00851565-P1
- Sep 8, 2026 — New job filed (Objections) X00851565-P2
- Sep 16, 2026 — New job filed (Objections) X00851565-P3
- Sep 16, 2026 — New job filed (Objections) X00851565-P4
- Sep 16, 2026 — New job filed (Objections) X00851565-S4
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.