Neighborhoods › Tottenville-Charleston › Building 5088090
Interior renovation: Ctf room conversion: existing school building r034…, est. $1.9M
528 Academy Avenue, Staten Island 10004 · Approved
| Job | S01440625 (3 filings: I1, S2, S1) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $1,940,550 |
| Scale | 4 → 4 stories; 2,550 sq ft |
| Work types | General Construction |
| Filed | Aug 4, 2026 |
| Professional | Synergy Strategic Design Architects |
| Building | BIN 5088090 · BBL 5078940001 |
| Official record | DOB NOW job S01440625 |
DOB description
S01440625-I1: CTF room conversion: existing school building R034, second floor Science Prep room 204, Storage room 204, Science Labs 207 & 209.
S01440625-S2: Remove the existing sinks and eye/face wash stations, including all associated piping, in accordance with the demolition of Rooms 207 and 209. Disconnect and remove all related domestic water, sanitary, vent, and other piping systems serving these fixture
S01440625-S1: Replace the existing exhaust grilles and balance airflow in the new rooms to meet the required ventilation rates.
Status timeline
- Aug 4, 2026 — New job filed (Approved) S01440625-I1
- Aug 5, 2026 — New job filed (Approved) S01440625-S1
- Aug 5, 2026 — New job filed (Approved) S01440625-S2
- Sep 10, 2026 — Plans approved (Approved) S01440625-I1
- Sep 22, 2026 — Plans approved (Approved) S01440625-S1
- Sep 22, 2026 — Plans approved (Approved) S01440625-S2
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.