NYC Permit AlertsBy BuildPermitGuide

Neighborhoods › Building 4624807

Facade/scaffold work: Heavy duty sidewalk shed during nb const, filed sep.…, est. $7K

3541 Shore Front Parkway, Queens 11237 · Permit Entire

JobQ01394815 (4 filings: I1, S3, S4, S2) · Alteration
Categoryfacade/scaffold
Estimated cost$7,000
Scale0 → 320 dwelling units; 378,415 sq ft
Work typesSidewalk Shed, Shed
FiledApr 30, 2026
ProfessionalPaul Perdek, Prof. Eng. Pllc
BuildingBIN 4624807 · BBL 4158620001
Official recordDOB NOW job Q01394815

DOB description

Q01394815-I1: HEAVY DUTY SIDEWALK SHED DURING NB CONST, FILED SEP. SIDEWALK SHED SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01394815-S3: BLDG D EQUIPMENT USE CARS 3&4: DUAL 6000 # CAPACITY PERSONNEL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPL. ELEVATOR APPLICATION SUBMITTED SEPARATELY
Q01394815-S4: BLDG D EQUIPMENT USE CARS 1&2: DUAL 6000 # CAPACITY PERSONNEL HOISTS DURING NB CONST, FILED SEP. HOISTS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION. ELEVATOR APPLICATION SUBMITTED SEPARATELY
Q01394815-S2: TEMPORARY CONSTRUCTION RAMPS AS PER DRAWINGS. CONSTRUCTION RAMPS SHALL COMPLY WITH CH #33 OF THE NYC BC. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.

Status timeline

Work permits

PermitWorkStatusIssuedExpires
Q01394815-S2-PMMProtection and Mechanical MethodsPermit IssuedJun 21, 2026Mar 30, 2027
Q01394815-S3-PMMProtection and Mechanical MethodsPermit IssuedMay 14, 2026Mar 30, 2027
Q01394815-S4-PMMProtection and Mechanical MethodsPermit IssuedMay 14, 2026Mar 30, 2027
Q01394815-I1-SHSidewalk ShedPermit IssuedMay 3, 2026Oct 27, 2026

Watch this block

Get an email when the next job is filed within 100 ft of this address. Free, weekly.