Neighborhoods › Ridgewood › Building 4087589
Facade/scaffold work: Existing 2 family, gc reno consisting of removal of…, est. $450K
61-53 Gates Avenue, Queens 11215 · Permit Entire
| Job | Q01386742 (7 filings: I1, P2, P3, S1, S2, P4, S3) · Alteration |
|---|---|
| Category | facade/scaffold |
| Estimated cost | $450,034 |
| Scale | 3 → 3 stories; 2 → 2 dwelling units; 3,660 sq ft |
| Work types | General Construction |
| Filed | Apr 19, 2026 |
| Professional | Ben Herzog Architect Pc |
| Building | BIN 4087589 · BBL 4036110041 |
| Official record | DOB NOW job Q01386742 |
DOB description
Q01386742-I1: Existing 2 family, GC reno consisting of removal of non-load bearing partitions and new interior layout @ Bas, 1st & 2nd fl, add new window at back facade, limited facade work & door replacements. No change to use, egress, occupancy, or bulk.
Q01386742-P2: Existing 2 family, GC reno consisting of removal of non-load bearing partitions and new interior layout @ Bas, 1st & 2nd fl, add new window at back facade, limited facade work & door replacements. No change to use, egress, occupancy, or bulk.
Q01386742-P3: Plumbing work in conjunction with GC reno of existing 2 family, PL work consisting of new 2" water service and all new fixtures throughout with associated piping (No Gas). No change to use, egress, occupancy, or bulk.
Q01386742-S1: Plumbing work in conjunction with GC reno of existing 2 family, PL work consisting of new 2" water service and all new fixtures throughout with associated piping (No Gas). No change to use, egress, occupancy, or bulk.
Q01386742-S2: Mechanical System work in conjunction with GC reno of existing 2 family, MS work consisting of new VRF DX split system and new exhaust fans, with associated mechanical piping and duct. No change to use, egress, occupancy, or bulk.
Q01386742-P4: Structural work conjunction with GC reno, consisting of reinforcements / replacement for removal & relocation of internal bearing wall, new basement window opening at rear, new roof top dunnage. No change to use, egress, occupancy, or bulk.
Q01386742-S3: Structural work conjunction with GC reno, consisting of reinforcements / replacement for removal & relocation of internal bearing wall, new basement window opening at rear, new roof top dunnage. No change to use, egress, occupancy, or bulk.
Status timeline
- Apr 19, 2026 — New job filed (Permit Entire) Q01386742-I1
- Jun 4, 2026 — New job filed (Approved) Q01386742-S1
- Jun 4, 2026 — New job filed (Approved) Q01386742-S2
- Jun 8, 2026 — New job filed (Approved) Q01386742-S3
- Jul 6, 2026 — Plans approved (Approved) Q01386742-S2
- Jul 14, 2026 — Plans approved (Approved) Q01386742-S3
- Sep 2, 2026 — New job filed (Approved) Q01386742-P2
- Sep 8, 2026 — New job filed (Approved) Q01386742-P3
- Oct 8, 2026 — Plans approved (Approved) Q01386742-P2
- Oct 8, 2026 — Plans approved (Approved) Q01386742-P3
- Oct 8, 2026 — Plans approved (Approved) Q01386742-S1
- Oct 13, 2026 — New job filed (Plan Examiner Review) Q01386742-P4
- Oct 14, 2026 — Permit issued — work can start (General Construction) Q01386742-I1
- Oct 15, 2026 — Permit issued — work can start (Permit Entire) Q01386742-I1
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| Q01386742-I1-GC | General Construction | Permit Issued | Oct 14, 2026 | Jun 8, 2027 |
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.