Neighborhoods › College Point › Building 4101223
Interior renovation: Proposed in-ground swimming pool at the rear, no change…, est. $197K
114 Malba Drive, Queens 11354 · Approved
| Job | Q01381883 (2 filings: I1, S2) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $196,975 |
| Scale | 2 → 2 stories; 1 → 1 dwelling units; 1,984 sq ft |
| Work types | General Construction, Foundation, Earthwork |
| Filed | Apr 13, 2026 |
| Professional | Bayside Engineering Pc |
| Building | BIN 4101223 · BBL 4044380001 |
| Official record | DOB NOW job Q01381883 |
DOB description
Q01381883-I1: PROPOSED IN-GROUND SWIMMING POOL AT THE REAR, NO CHANGE IN USE, EGRESS OR OCCUPANCY.
Q01381883-S2: PROPOSED "PLUMBING WORKS ONLY"IN-GROUND SWIMMING POOL AT THE REAR OPEN SPACE, AS PER PLAN IN CONJUNCTIONWITH DOB NOW GC JOB NO.:Q01381883-I1.
Status timeline
- Apr 13, 2026 — New job filed (Approved) Q01381883-I1
- Apr 13, 2026 — New job filed (Approved) Q01381883-S2
- Sep 11, 2026 — Plans approved (Approved) Q01381883-I1
- Sep 11, 2026 — Plans approved (Approved) Q01381883-S2
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.