Neighborhoods › Washington Heights (South) › Building 1062854
Interior renovation: Interior renovation of existing apt#41 at 4th floor.…, est. $86K
566 West 162 Street, Manhattan 11354 · Approved
| Job | M01453589 (2 filings: I1, S1) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $86,350 |
| Scale | 39 → 39 stories; 39 → 39 dwelling units; 1,085 sq ft |
| Work types | General Construction |
| Filed | Sep 3, 2026 |
| Professional | Z & T Engineering, P.C. |
| Building | BIN 1062854 · BBL 1021200008 |
| Official record | DOB NOW job M01453589 |
DOB description
M01453589-I1: Interior renovation of existing Apt#41 at 4th floor. removal and installation of non-load bearing partition wall and doors, new wood flooring, and paint finish as per plan. PL work type to be filed separately. No change in use, occupancy or egress.
M01453589-S1: PL work type filed in conjunction with GC application#M01453589-I1. Direct replacement of existing (1) W.C., (1) Lav. (1) bathtub, (1) sink and (1) gas range to be removed & replaced with new electric range. No change in use, occupancy or means of egress.
Status timeline
- Sep 3, 2026 — New job filed (Approved) M01453589-I1
- Sep 3, 2026 — New job filed (Approved) M01453589-S1
- Sep 8, 2026 — Plans approved (Approved) M01453589-S1
- Sep 17, 2026 — Plans approved (Approved) M01453589-I1
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.