NYC Permit AlertsBy BuildPermitGuide

Neighborhoods › Financial District-Battery Park City › Building 1001290

Interior renovation: Reconfiguration of first floor, lobby, mail room…, est. $2.2M

49 Fulton Street, Manhattan 10001 · Approved

JobM01386262 (5 filings: I1, S1, S4, S3, S2) · Alteration
Categoryinterior renovation
Estimated cost$2,185,268
Scale20 → 20 stories; 251 → 251 dwelling units; 10,705 sq ft
Work typesGeneral Construction
FiledJun 28, 2026
ProfessionalCta Architects P.C.
BuildingBIN 1001290 · BBL 1000950027
Official recordDOB NOW job M01386262

DOB description

M01386262-I1: RECONFIGURATION OF FIRST FLOOR, LOBBY, MAIL ROOM, OFFICES AND LIBRARY SPACE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01386262-S1: MECHANICAL WORK TO INSTALL PACKAGE ROOF TOP UNITS, DOAS AND VRF SYSTEMS AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01386262-S4: REINFORCEMENT OF THE EXISTING STRUCTURE TO SUPPORT THEINSTALLATION OF THREE NEW ROOFTOP MECHANICAL UNITS (RTU-1, RTU-2AND RTU-3).FRAME OUT A NEW OPENING AT THE ROOF FOR THE NEW PROPOSEDMECHANICAL UNITS AS PER PLANS FILED HEREWITH.
M01386262-S3: MODIFICATION TO EXISTING SPRINKLER SYSTEM AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01386262-S2: PLUMBING WORK TO REMOVE AND REPLACE EXISTING PLUMBING FIXTURES. ALONG WITH ADDITION OF A NEW SINK AND ALL ASSOCIATED PLUMBING LINES.( SAN, VENT,DOMESTIC HOT & COLD WATER) TO ACCOMDATE ARCHITECTURAL PROGRAMMING. NO CHANGE IN OCCUPANCY OR EGRESS.

Status timeline

Map

Watch this block

Get an email when the next job is filed within 100 ft of this address. Free, weekly.