Neighborhoods › Financial District-Battery Park City › Building 1001018
Interior renovation: Scope of work includes but not limited to add exterior…, est. $693K
40 Wall Street, Manhattan 11377 · Approved
| Job | M01345706 (4 filings: I1, S1, S2, S3) · Alteration CO |
|---|---|
| Category | interior renovation |
| Estimated cost | $693,274 |
| Scale | 70 → 70 stories; 4,608 sq ft |
| Work types | General Construction |
| Filed | Mar 10, 2026 |
| Professional | Agp Architect, Pc |
| Building | BIN 1001018 · BBL 1000430002 |
| Official record | DOB NOW job M01345706 |
DOB description
M01345706-I1: SCOPE OF WORK INCLUDES BUT NOT LIMITED TO ADD EXTERIOR ADA LIFT, REMOVE AND REPLACEEXISTING EXTERIOR DOORS, INTERIOR ALTERATION WITH NEW PARTITIONS, CEILINGS AND ASSOCIATED HVAC, PLUMBING AND ELECTRICAL WORK ON PARTIAL SECOND FLOOR. NO CHANGE OF EGRESS
M01345706-S1: installation of new energy recovery unit for outside air brought into the space. ductwork distribution is to be updated to align to new program space with new electric duct heaters to be added. existing fan coil units are to be rebalanced to accommodate
M01345706-S2: SCOPE OF WORK INCLUDES INSTALLATION OF NEW PLUMBING FIXTURES. NEW HOT WATER SYSTEM IS TO BE PROVIDED BY TWO (2) NEW ELECTRIC STORAGE WATER HEATERS AND HWAT. ALL NEW PLUMBING PIPING SHALL BE PROVIDED AND CONNECTED INTO THE BUILDING EXISTING UTILITIES.
M01345706-S3: SPRINKLER MODIFICATION TO SECOND FL,OOR PINE STREET SCHOOL AS PER PLANS FILED HEREWITH.
Status timeline
- Mar 10, 2026 — New job filed (Approved) M01345706-I1
- Mar 22, 2026 — New job filed (Approved) M01345706-S3
- Apr 1, 2026 — New job filed (Approved) M01345706-S1
- Apr 1, 2026 — New job filed (Approved) M01345706-S2
- Jul 6, 2026 — Plans approved (Approved) M01345706-I1
- Aug 10, 2026 — Plans approved (Approved) M01345706-S3
- Aug 25, 2026 — Plans approved (Approved) M01345706-S1
- Sep 29, 2026 — Plans approved (Approved) M01345706-S2