Neighborhoods › Midtown-Times Square › Building 1035477
Interior renovation: Installation of partitions, walls, doors, floor…, est. $700K
12 East 52 Street, Manhattan 07945 · Permit Entire
| Job | M01338887 (6 filings: I1, S1, S3, S4, P1, S2) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $700,000 |
| Scale | 7 → 7 stories; 20,210 sq ft |
| Work types | General Construction |
| Filed | Apr 7, 2026 |
| Professional | the Switzer Group |
| Building | BIN 1035477 · BBL 1012870062 |
| Official record | DOB NOW job M01338887 |
DOB description
M01338887-I1: INSTALLATION OF PARTITIONS, WALLS, DOORS, FLOOR FINISHES & CEILINGS . NO CHANGE TO USE, EGRESS OR OCCUPANCY.S SHOW ON DRAWING. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01338887-S1: MODIFDICATION TO EXISTING MECHAICAL SYSTEM AND RELATED PIPING. INSTALLATION OF NEW A/C UNITS AS SHOWN ON DRIAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01338887-S3: MODIFICATION TO EXISTING SPRINKLER SYSTEM AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01338887-S4: FILING HEREWITH FOR SUPPORT OF OPENINGS IN MASONRY WALLS, SUPPORT OF BUILT UP CONCRETE SLABS & RAMPS AND SUPPORT OF FOLDING PARTITIONS AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01338887-P1: MODIFICATION TO EXISITING PLIMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANYC.
M01338887-S2: MODIFICATION TO EXISITING PLIMBING FIXTURES AND RELATED PIPING AS SHOWN ON DRAWINGS. NO CHANGE TO USE, EGRESS OR OCCUPANYC.
Status timeline
- Apr 7, 2026 — New job filed (Permit Entire) M01338887-I1
- Apr 7, 2026 — New job filed (Permit Entire) M01338887-S1
- Apr 7, 2026 — New job filed (Permit Entire) M01338887-S2
- Apr 7, 2026 — New job filed (Permit Entire) M01338887-S3
- Apr 7, 2026 — New job filed (Permit Entire) M01338887-S4
- Apr 20, 2026 — Permit issued — work can start (Mechanical Systems) M01338887-S1
- Apr 20, 2026 — Permit issued — work can start (Structural) M01338887-S4
- Apr 21, 2026 — Permit issued — work can start (Permit Entire) M01338887-S1
- Apr 21, 2026 — Permit issued — work can start (Permit Entire) M01338887-S4
- Apr 26, 2026 — Permit issued — work can start (Plumbing) M01338887-S2
- Apr 26, 2026 — Permit issued — work can start (Sprinklers) M01338887-S3
- Apr 27, 2026 — Permit issued — work can start (Permit Entire) M01338887-S3
- May 12, 2026 — Permit issued — work can start (General Construction) M01338887-I1
- May 13, 2026 — Permit issued — work can start (Permit Entire) M01338887-I1
- Sep 23, 2026 — New job filed (Approved) M01338887-P1
- Sep 28, 2026 — Plans approved (Approved) M01338887-P1
- Sep 28, 2026 — Permit issued — work can start (Permit Entire) M01338887-S2
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01338887-I1-GC | General Construction | Permit Issued | May 12, 2026 | Mar 9, 2027 |
| M01338887-S2-PL | Plumbing | Permit Issued | Apr 26, 2026 | Apr 27, 2027 |
| M01338887-S3-EW-SP | Sprinklers | Permit Issued | Apr 26, 2026 | Apr 27, 2027 |
| M01338887-S1-MS | Mechanical Systems | Permit Issued | Apr 20, 2026 | Mar 9, 2027 |
| M01338887-S4-ST | Structural | Permit Issued | Apr 20, 2026 | Mar 9, 2027 |
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.