Neighborhoods › East Midtown-Turtle Bay › Building 1076268
Interior renovation: Level 23 general construction for office…, est. $3.5M
277 Park Avenue, Manhattan 10017 · Permit Entire
| Job | M01334269 (4 filings: I1, S1, S2, S3) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $3,500,000 |
| Scale | 50 → 50 stories; 1,000 sq ft |
| Work types | General Construction |
| Filed | Feb 12, 2026 |
| Professional | Cannondesign |
| Building | BIN 1076268 · BBL 1013027501 |
| Official record | DOB NOW job M01334269 |
DOB description
M01334269-I1: LEVEL 23 GENERAL CONSTRUCTION FOR OFFICE FITOUTINCLUDING NEW PARTITIONS, INTERIOR GLAZING, FLOORING,CEILING, LIGHTING, AND LIGHTING CONTROLS.NO IMPACT ON PRESENT ZONING OF BUILDING/LOTS. FLOORAREA AND OCCUPANCY TO REMAIN UNCHANGED. NOEXTERIOR CHANGES OR R
M01334269-S1: LEVEL 23 INSTALLATION OF NEW DUCTED HVAC SYSTEMCONNECTED TO EXISTING BUILDING AIR HANDLING UNITS,INSTALLED IN COORDINATION WITH ARCHITECTURAL LAYOUT.EXISTING PERIMETER INDUCTION UNITS TO REMAIN
M01334269-S2: A wet pipe sprinkler system extending from the existing zone control in the stairwell at level 23 to provide proper coverage as required, in coordination with architectural layout.
M01334269-S3: Domestic cold water, waste, and vent piping extending from the main plumbing risers at the toilet rooms to feed new plumbing fixtures as part of the renovation. Point of use tankless, electric water heaters will be included at sinks to provide HW was req.
Status timeline
- Feb 12, 2026 — New job filed (Permit Entire) M01334269-I1
- Feb 22, 2026 — New job filed (Permit Entire) M01334269-S2
- Feb 23, 2026 — New job filed (Permit Entire) M01334269-S3
- Feb 24, 2026 — New job filed (Permit Entire) M01334269-S1
- May 20, 2026 — Permit issued — work can start (General Construction) M01334269-I1
- May 20, 2026 — Permit issued — work can start (Mechanical Systems) M01334269-S1
- May 21, 2026 — Permit issued — work can start (Sprinklers) M01334269-S2
- May 21, 2026 — Permit issued — work can start (Plumbing) M01334269-S3
- May 22, 2026 — Permit issued — work can start (Permit Entire) M01334269-S3
- May 22, 2026 — Permit issued — work can start (Permit Entire) M01334269-S2
- Sep 2, 2026 — Permit issued — work can start (Permit Entire) M01334269-S1
- Sep 3, 2026 — Permit issued — work can start (Permit Entire) M01334269-I1
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01334269-S2-EW-SP | Sprinklers | Permit Issued | May 21, 2026 | May 22, 2027 |
| M01334269-S3-PL | Plumbing | Permit Issued | May 21, 2026 | May 22, 2027 |
| M01334269-I1-GC | General Construction | Permit Issued | May 20, 2026 | Sep 3, 2027 |
| M01334269-S1-MS | Mechanical Systems | Permit Issued | May 20, 2026 | Sep 2, 2027 |