Neighborhoods › Upper East Side-Yorkville › Building 1048724
Full demolition of 4-story building, est. $200K
207 East 84 Street, Manhattan 10001 · Approved
| Job | M01331393 (6 filings: I1, P3, S1, P1, S3, S2) · Full Demolition |
|---|---|
| Category | demolition |
| Estimated cost | $200,000 |
| Work types | Full Demolition |
| Filed | Jan 14, 2026 |
| Professional | Ancora Engineering, Pllc |
| Building | BIN 1048724 · BBL 1015300001 |
| Official record | DOB NOW job M01331393 |
DOB description
M01331393-I1: TO BE DEMOLISHED BY HAND WITH MECHANICAL ASSIST AND FULL MECHANICAL MEANS
M01331393-P3: mechanical means to assist with demolition from the exterior, EES will be built along the exterior, and chute will be built to lower debris from floor to floor
M01331393-S1: mechanical means to assist with demolition from the exterior, EES will be built along the exterior, and chute will be built to lower debris from floor to floor
M01331393-P1: INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01331393-S3: INSTALLATION OF 300 PSF SIDEWALK SHED AND PIPE SCAFFOLD AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CHAPTER #33 OF THE 2022 CODE. NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
M01331393-S2: installation of construction fence to protect site during full demolition.
Status timeline
- Jan 14, 2026 — New job filed (Approved) M01331393-I1
- Jan 14, 2026 — New job filed (Permit Entire) M01331393-S2
- Feb 5, 2026 — Permit issued — work can start (Construction Fence) M01331393-S2
- Feb 6, 2026 — Permit issued — work can start (Permit Entire) M01331393-S2
- Mar 11, 2026 — New job filed (Permit Entire) M01331393-S3
- Mar 11, 2026 — Permit issued — work can start (Sidewalk Shed) M01331393-S3
- Mar 11, 2026 — Permit issued — work can start (Sidewalk Shed) M01331393-S3
- Apr 13, 2026 — New job filed (Approved) M01331393-P1
- Apr 14, 2026 — Plans approved (Approved) M01331393-P1
- Jun 10, 2026 — New job filed (Permit Entire) M01331393-S1
- Jul 1, 2026 — Plans approved (Approved) M01331393-I1
- Jul 20, 2026 — Permit issued — work can start (Protection and Mechanical Methods) M01331393-S1
- Aug 27, 2026 — New job filed (Approved) M01331393-P3
- Aug 31, 2026 — Permit issued — work can start (Permit Entire) M01331393-S1
- Sep 24, 2026 — Plans approved (Approved) M01331393-P3
- Oct 7, 2026 — Permit issued — work can start (Permit Entire) M01331393-S3
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01331393-S1-PMM | Protection and Mechanical Methods | Permit Issued | Jul 20, 2026 | Dec 27, 2026 |
| M01331393-S3-SF | Sidewalk Shed | Permit Issued | Mar 11, 2026 | Dec 9, 2026 |
| M01331393-S3-SH | Sidewalk Shed | Permit Issued | Mar 11, 2026 | Dec 8, 2026 |
| M01331393-S2-FN | Construction Fence | Permit Issued | Feb 5, 2026 | Dec 28, 2026 |