Neighborhoods › Midtown-Times Square › Building 1015891
Interior renovation: Proposed residential conversion of an existing…, est. $6.7M
29 West 35 Street, Manhattan 10018 · Permit Entire
| Job | M01328972 (2 filings: I1, S6) · Alteration CO |
|---|---|
| Category | interior renovation |
| Estimated cost | $6,707,840 |
| Scale | 12 → 12 stories; 0 → 107 dwelling units; 83,848 sq ft |
| Work types | General Construction |
| Filed | Dec 22, 2025 |
| Professional | Ismael Leyva Architects, P.C. |
| Building | BIN 1015891 · BBL 1008370023 |
| Official record | DOB NOW job M01328972 |
DOB description
M01328972-I1: Proposed residential conversion of an existing 12-storey commercial building to mix-use commercial and residential use. No change in bulk or floor area.
M01328972-S6: Structural framing and reinforcements on floors Cellar, Mez, 1-12 and Roof as per plans filed herewith.
Status timeline
- Dec 22, 2025 — New job filed (Permit Entire) M01328972-I1
- Feb 24, 2026 — New job filed (Permit Entire) M01328972-S6
- May 28, 2026 — Permit issued — work can start (General Construction) M01328972-I1
- May 28, 2026 — Permit issued — work can start (Structural) M01328972-S6
- May 29, 2026 — Permit issued — work can start (Permit Entire) M01328972-S6
- May 29, 2026 — Permit issued — work can start (Permit Entire) M01328972-I1
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01328972-I1-GC | General Construction | Permit Issued | May 28, 2026 | Dec 30, 2026 |
| M01328972-S6-ST | Structural | Permit Issued | May 28, 2026 | Dec 30, 2026 |
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.