Neighborhoods › Midtown South-Flatiron-Union Square › Building 1016145
Interior renovation: Filed herewith for the interior renovation of 3rd floor…, est. $260K
111 5 Avenue, Manhattan 10038 · LOC Issued
| Job | M01327021 (2 filings: I1, S1) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $260,000 |
| Scale | 13 → 13 stories; 500 sq ft |
| Work types | General Construction |
| Filed | Dec 10, 2025 |
| Professional | Bai Group |
| Building | BIN 1016145 · BBL 1008470001 |
| Official record | DOB NOW job M01327021 |
DOB description
M01327021-I1: FILED HEREWITH FOR THE INTERIOR RENOVATION OF 3RD FLOOR INCLUDING THE INSTALLATION OF NON-LOAD BEARING PARTITIONS, INTERIOR STAIR REMOVED, FINISHES. THERE IS NO CHANGE IN USE EGRESS OR OCCUPANCY.
M01327021-S1: STRUCTURAL SCOPE AS FILED HEREWITH RELATED TO THE REMOVAL OF THE CONVENIENT STAIR AND SEALING OF THE STAIR OPENING.. NO CHANGES TO USE, EGRESS OR OCCUPANCY.
Status timeline
- Dec 10, 2025 — New job filed (LOC Issued) M01327021-I1
- Dec 11, 2025 — New job filed (LOC Issued) M01327021-S1
- Feb 20, 2026 — Job signed off (LOC Issued) M01327021-S1
- Feb 20, 2026 — Job signed off (LOC Issued) M01327021-I1
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01327021-I1-GC | General Construction | Signed-off | Dec 18, 2025 | Aug 16, 2026 |
| M01327021-S1-ST | Structural | Signed-off | Dec 18, 2025 | Aug 16, 2026 |
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.