Neighborhoods › Upper East Side-Carnegie Hill › Building 1046985
Facade/scaffold work: Install (1) new 10 gage 304 stainless steel chimney…, est. $45K
51 East 90 Street, Manhattan 10553 · LOC Issued
| Job | M01319996 (7 filings: I1, P3, S2, P2, P4, S1, P1) · Alteration |
|---|---|
| Category | facade/scaffold |
| Estimated cost | $45,000 |
| Scale | 9 → 9 stories; 38 → 38 dwelling units; 51,475 sq ft |
| Work types | General Construction |
| Filed | Dec 2, 2025 |
| Professional | Robert Germain Jr. Pe |
| Building | BIN 1046985 · BBL 1015020023 |
| Official record | DOB NOW job M01319996 |
DOB description
M01319996-I1: INSTALL (1) NEW 10 GAGE 304 STAINLESS STEEL CHIMNEY LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M01319996-P3: REPLACEMENT (1) NEW COMBINATION GAS/OIL BURNER ON (1) NEW LP BOILER. STRAIGHT GAS ONLY AT THIS TIME. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M01319996-S2: REPLACEMENT (1) NEW COMBINATION GAS/OIL BURNER ON (1) NEW LP BOILER. STRAIGHT GAS ONLY AT THIS TIME. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M01319996-P2: NEW GAS FIRED HOT WATER HEATER WITH (1) NEW STORAGE TANK. RECONNECT EXISTING LP GAS LINE. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M01319996-P4: NEW GAS FIRED HOT WATER HEATER WITH (1) NEW STORAGE TANK. RECONNECT EXISTING LP GAS LINE. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M01319996-S1: NEW GAS FIRED HOT WATER HEATER WITH (1) NEW STORAGE TANK. RECONNECT EXISTING LP GAS LINE. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
M01319996-P1: INSTALL (1) NEW 10 GAGE 304 STAINLESS STEEL CHIMNEY LINER IN EXISTING BRICK CHIMNEY. NO CHANGE IN MEANS OF EGRESS, USE GROUP OR OCCUPANCY.
Status timeline
- Dec 2, 2025 — New job filed (LOC Issued) M01319996-I1
- Dec 2, 2025 — New job filed (Permit Entire) M01319996-S1
- Dec 2, 2025 — New job filed (Permit Entire) M01319996-S2
- Dec 14, 2025 — Permit issued — work can start (Plumbing) M01319996-S1
- Sep 16, 2026 — New job filed (Approved) M01319996-P1
- Sep 16, 2026 — New job filed (Approved) M01319996-P2
- Sep 16, 2026 — New job filed (Approved) M01319996-P3
- Sep 18, 2026 — Plans approved (Approved) M01319996-P1
- Sep 18, 2026 — Plans approved (Approved) M01319996-P3
- Sep 18, 2026 — Permit issued — work can start (Permit Entire) M01319996-S2
- Sep 18, 2026 — Plans approved (Approved) M01319996-P2
- Sep 22, 2026 — New job filed (Approved) M01319996-P4
- Sep 25, 2026 — Job signed off (LOC Issued) M01319996-I1
- Sep 25, 2026 — Plans approved (Approved) M01319996-P4
- Sep 25, 2026 — Permit issued — work can start (Permit Entire) M01319996-S1
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01319996-I1-GC | General Construction | Signed-off | Dec 14, 2025 | Dec 30, 2026 |
| M01319996-S1-PL | Plumbing | Permit Issued | Dec 14, 2025 | Dec 15, 2026 |
| M01319996-S2-BE | Boiler Equipment | Signed-off | Dec 14, 2025 | Dec 15, 2026 |
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.