Neighborhoods › East Midtown-Turtle Bay › Building 1085735
Interior renovation: Hereby filing to patch and repair existing roofing and…, est. $3.7M
200 Park Avenue, Manhattan 10004 · Permit Entire
| Job | M01313826 (4 filings: I1, S1, S2, S3) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $3,675,822 |
| Scale | 59 → 59 stories; 7,000 sq ft |
| Work types | General Construction |
| Filed | Dec 23, 2025 |
| Professional | Mdeas Architects |
| Building | BIN 1085735 · BBL 1012809010 |
| Official record | DOB NOW job M01313826 |
DOB description
M01313826-I1: Hereby filing to Patch and repair existing roofing and modify existing guardrail, for installation of building maintenance unit infrastructure as shown on plans filed herewith. NO change to use, occupancy or egress.
M01313826-S1: Hereby filing to install Three (3) new hose bibs at the roof level for installation of building maintenance unit infrastructure as shown on plans filed herewith. No change to use, occupancy or egress.
M01313826-S2: Hereby filing Relocation of existing standpipe piping and replacement of existing 3-way roof manifold as shown on plans filed herewith. No change to use, occupancy or egress.
M01313826-S3: HEREBY FILING REMOVAL OF MECHANICAL EQUIPMENT AND ASSOCIATED DUCTWORK AND PIPING AS SHOWN ON PLANS FILED HEREWITH. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Status timeline
- Dec 23, 2025 — New job filed (Permit Entire) M01313826-I1
- Dec 28, 2025 — New job filed (Permit Entire) M01313826-S1
- Dec 28, 2025 — New job filed (Permit Entire) M01313826-S2
- Dec 29, 2025 — New job filed (Permit Entire) M01313826-S3
- Mar 9, 2026 — Permit issued — work can start (General Construction) M01313826-I1
- Mar 9, 2026 — Permit issued — work can start (Mechanical Systems) M01313826-S3
- Mar 10, 2026 — Permit issued — work can start (Permit Entire) M01313826-I1
- Mar 10, 2026 — Permit issued — work can start (Permit Entire) M01313826-S3
- Mar 16, 2026 — Permit issued — work can start (Plumbing) M01313826-S1
- Mar 17, 2026 — Permit issued — work can start (Permit Entire) M01313826-S1
- Mar 19, 2026 — Permit issued — work can start (Standpipe) M01313826-S2
- Mar 20, 2026 — Permit issued — work can start (Permit Entire) M01313826-S2
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01313826-S2-EW-SD | Standpipe | Permit Issued | Mar 19, 2026 | Mar 20, 2027 |
| M01313826-S1-PL | Plumbing | Permit Issued | Mar 16, 2026 | Mar 17, 2027 |
| M01313826-I1-GC | General Construction | Permit Issued | Mar 9, 2026 | Dec 30, 2026 |
| M01313826-S3-MS | Mechanical Systems | Permit Issued | Mar 9, 2026 | Dec 30, 2026 |