Neighborhoods › Upper West Side (Central) › Building 1030085
Interior renovation: Proposed merge of two units (4d and 4e) into one and…, est. $75K
136 West 75 Street, Manhattan 11379 · Filing Withdrawn
| Job | M01301445 · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $75,000 |
| Scale | 6 → 6 stories; 30 → 30 dwelling units; 500 sq ft |
| Work types | General Construction |
| Filed | Dec 9, 2025 |
| Professional | Norman C. Lok, Pe |
| Building | BIN 1030085 · BBL 1011460049 |
| Official record | DOB NOW job M01301445 |
DOB description
M01301445-I1: PROPOSED MERGE OF TWO UNITS (4D AND 4E) INTO ONE AND INTERIOR ALTERATIONS
Status timeline
- Dec 9, 2025 — New job filed (Filing Withdrawn)
- Jun 25, 2026 — Filing withdrawn (Filing Withdrawn)
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.