Neighborhoods › Upper East Side-Yorkville › Building 1048510
Sign or curb cut: Filing herewith for interior renovation of first floor…, est. $586K
211 East 79 Street, Manhattan 07701 · Permit Entire
| Job | M01297529 (7 filings: I1, S2, S1, P2, S3, P1, S4) · Alteration |
|---|---|
| Category | sign/curb cut |
| Estimated cost | $586,350 |
| Scale | 17 → 17 stories; 3,909 sq ft |
| Work types | General Construction |
| Filed | Jan 13, 2026 |
| Professional | Pallante Design, Llc |
| Building | BIN 1048510 · BBL 1015250005 |
| Official record | DOB NOW job M01297529 |
DOB description
M01297529-I1: Filing herewith for interior renovation of first floor lobby area. Remove and install new non load bearing partitions, fixtures and finishes. Replacement of exterior canopy.
M01297529-S2: Remove and replace mechanical ductwork for renovation of 1st floor space.
M01297529-S1: REMOVE AND CONSTRUCT A NEW ENTRANCE CANOPY TO BE CONSTRUCTED OF ASTEEL FRAME WITH A METAL DECK ROOF AND CREATE A NEW SLAB OPENING IN THE GROUND, SECOND AND THIRD FLOOR FOR AN MEP SHAFT. IN CONJUNCTION WITH GC# M01297529-I1.
M01297529-P2: Remove, relocate and replace plumbing fixtures and related piping.
M01297529-S3: Remove, relocate and replace plumbing fixtures and related piping.
M01297529-P1: Remove, relocate, and install sprinkler heads and related piping.
M01297529-S4: Remove, relocate, and install sprinkler heads and related piping.
Status timeline
- Jan 13, 2026 — New job filed (Permit Entire) M01297529-I1
- Jan 13, 2026 — New job filed (Approved) M01297529-S3
- Jan 13, 2026 — New job filed (Approved) M01297529-S4
- Jan 14, 2026 — New job filed (Permit Entire) M01297529-S1
- Jan 14, 2026 — New job filed (Approved) M01297529-S2
- May 26, 2026 — Permit issued — work can start (General Construction) M01297529-I1
- May 27, 2026 — Permit issued — work can start (Permit Entire) M01297529-I1
- Jul 9, 2026 — New job filed (Approved) M01297529-P1
- Jul 9, 2026 — New job filed (Approved) M01297529-P2
- Jul 15, 2026 — Plans approved (Approved) M01297529-P2
- Jul 15, 2026 — Plans approved (Approved) M01297529-S3
- Jul 16, 2026 — Permit issued — work can start (Structural) M01297529-S1
- Jul 17, 2026 — Permit issued — work can start (Permit Entire) M01297529-S1
- Jul 20, 2026 — Plans approved (Approved) M01297529-S2
- Jul 24, 2026 — Plans approved (Approved) M01297529-P1
- Jul 24, 2026 — Plans approved (Approved) M01297529-S4
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01297529-S1-ST | Structural | Permit Issued | Jul 16, 2026 | Nov 7, 2026 |
| M01297529-I1-GC | General Construction | Permit Issued | May 26, 2026 | Nov 7, 2026 |