Neighborhoods › Central Park › Building 1083810
Interior renovation: New tang wing. this project will replace existing…, est. $154M
1000 5 Avenue, Manhattan 10271 · Approved
| Job | M01289549 (15 filings: I1, S6, S2, Z3, S4, S5, Z1, Z2, S3, S9, S8, Z6, Z5, Z7, Z4) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $153,578,113 |
| Scale | 5 → 5 stories; 2 sq ft |
| Work types | General Construction |
| Filed | Nov 4, 2025 |
| Professional | Beyer Blinder Belle |
| Building | BIN 1083810 · BBL 1011110001 |
| Official record | DOB NOW job M01289549 |
DOB description
M01289549-I1: NEW TANG WING. THIS PROJECT WILL REPLACE EXISTING GALLERY (F-3) AND ACCESSORY SPACES WITH NEW GALLERY (F-3) AND ACCESSORY SPACES.WORK INCLUDES DEMO OF THE ABOVE GRADE PORTIONS OF THE LILA ACHESON WALLACE WING INCLUDING THE 1ST FL MEZ, 2-4TH FL.
M01289549-S6: NEW TANG WING. STRUCTURAL WORK AS PER PLANS FILED HEREWITH. PLEASE REFER TO COMMENTS FOR DETAILED SCOPE OF WORK.
M01289549-S2: New Tang Wing. Installation of new mechanical system as per plans.
M01289549-Z3: Partial demolition means & methods of Oscar L. Tang and H.M. Agnes Hsu-Tang Wing.
M01289549-S4: NEW TANG WING. SPRINKLER AND STANDPIPE WORK AS PER PLANS.
M01289549-S5: New Tang Wing. SOE work as per plans.
M01289549-Z1: New Tang Wing. Earthwork as per plans filed herewith.
M01289549-Z2: Mechanical equipment use for interior partial demolition filed separately under M01289549-I1.
M01289549-S3: NEW TANG WING. REMOVE ALL EXISTING FIXTURES AND INSTALL NEW PLUMBING FIXTURES AND PIPING IN NEW TANG WING.
M01289549-S9: NEW TANG WING. WORK INCLUDES THE INSTALLATION OF STORMWATER MANAGEMENT PRACTICES AND SEWER CONNECTIONS TO EXISTING SEWERS FOR STORM AND SANITARY DISCHARGE.
M01289549-S8: NEW TANG WING. UNDERPINNING WORK FILED IN CONJUNCTION WITH SOE APPLICATION M01289549-S5.
M01289549-Z6: Installation of temporary debris chute for use during partial demolition, filed separately under M01289549-I1.
M01289549-Z5: Use of mechanical demolition equipment during partial demolition, filed separately under M01289549-I1.
M01289549-Z7: Installation of engineered enclosure system for use during partial demolition, filed separately under M01289549-I1.
M01289549-Z4: Installation of temporary debris chute for use during interior demolition, filed separately under M01289549-I1.
Status timeline
- Nov 4, 2025 — New job filed (Approved) M01289549-I1
- Dec 8, 2025 — New job filed (Filing Withdrawn) M01289549-S5
- Dec 10, 2025 — New job filed (Approved) M01289549-S2
- Dec 10, 2025 — New job filed (Approved) M01289549-S3
- Dec 10, 2025 — New job filed (Plan Examiner Review) M01289549-S4
- Dec 10, 2025 — New job filed (Approved) M01289549-S6
- Jan 25, 2026 — New job filed (Approved) M01289549-S8
- Feb 24, 2026 — New job filed (Filing Withdrawn) M01289549-Z1
- Mar 1, 2026 — New job filed (Approved) M01289549-S9
- Apr 21, 2026 — New job filed (Permit Entire) M01289549-Z2
- May 8, 2026 — Plans approved (Approved) M01289549-S9
- May 10, 2026 — New job filed (Approved) M01289549-Z3
- May 13, 2026 — Plans approved (Approved) M01289549-I1
- May 15, 2026 — Plans approved (Approved) M01289549-S2
- May 15, 2026 — Plans approved (Approved) M01289549-S6
- May 15, 2026 — Plans approved (Approved) M01289549-S3
- May 27, 2026 — Filing withdrawn (Filing Withdrawn) M01289549-Z1
- Jun 4, 2026 — Filing withdrawn (Filing Withdrawn) M01289549-S5
- Jun 11, 2026 — Plans approved (Approved) M01289549-S8
- Jun 28, 2026 — Permit issued — work can start (Protection and Mechanical Methods) M01289549-Z2
- Jun 29, 2026 — Permit issued — work can start (Permit Entire) M01289549-Z2
- Jul 19, 2026 — New job filed (Permit Entire) M01289549-Z5
- Jul 19, 2026 — New job filed (Permit Entire) M01289549-Z6
- Jul 19, 2026 — New job filed (Permit Entire) M01289549-Z7
- Jul 19, 2026 — Permit issued — work can start (Protection and Mechanical Methods) M01289549-Z5
- Jul 19, 2026 — Permit issued — work can start (Protection and Mechanical Methods) M01289549-Z7
- Jul 20, 2026 — Permit issued — work can start (Permit Entire) M01289549-Z5
- Jul 20, 2026 — Permit issued — work can start (Permit Entire) M01289549-Z7
- Jul 21, 2026 — New job filed (Permit Entire) M01289549-Z4
- Jul 22, 2026 — Plans approved (Approved) M01289549-Z3
- Aug 25, 2026 — Permit issued — work can start (Protection and Mechanical Methods) M01289549-Z4
- Aug 25, 2026 — Permit issued — work can start (Protection and Mechanical Methods) M01289549-Z6
- Aug 26, 2026 — Permit issued — work can start (Permit Entire) M01289549-Z6
- Aug 26, 2026 — Permit issued — work can start (Permit Entire) M01289549-Z4
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01289549-Z4-PMM | Protection and Mechanical Methods | Permit Issued | Aug 25, 2026 | Nov 28, 2026 |
| M01289549-Z6-PMM | Protection and Mechanical Methods | Permit Issued | Aug 25, 2026 | Nov 28, 2026 |
| M01289549-Z5-PMM | Protection and Mechanical Methods | Permit Issued | Jul 19, 2026 | Nov 28, 2026 |
| M01289549-Z7-PMM | Protection and Mechanical Methods | Permit Issued | Jul 19, 2026 | Nov 28, 2026 |
| M01289549-Z2-PMM | Protection and Mechanical Methods | Permit Issued | Jun 28, 2026 | Nov 28, 2026 |