Neighborhoods › Chelsea-Hudson Yards › Building 1089695
Interior renovation: Interior renovation of 1st floor food prep spaces and…, est. $689K
450 West 33 Street, Manhattan 10001 · Permit Entire
| Job | M01281472 (8 filings: I1, S1, P2, P3, P4, S2, S4, S3) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $688,628 |
| Scale | 15 → 15 stories; 8,346 sq ft |
| Work types | General Construction |
| Filed | Nov 12, 2025 |
| Professional | S9 Architecture and Engineering Dpc |
| Building | BIN 1089695 · BBL 1007297503 |
| Official record | DOB NOW job M01281472 |
DOB description
M01281472-I1: INTERIOR RENOVATION OF 1ST FLOOR FOOD PREP SPACES AND RETAIL #4. REMOVAL OF WALL BETWEEN RETAIL #4 AND MARKET HALL LOBBY AT THE 10TH AVE ENTRY, INCLUDING INSTALLATION OF A SMOKE BAFFLE. NEW ACCESSIBLE RAMP ENTRY TO RETAIL #4. NO REMOVAL OF BASE BUILDING S
M01281472-S1: Removal of the existing kitchen and provide capped supply air connections for future prep areas and one new AC unit. New air distribution for new retail #4. New capped black iron ductwork for future tenant
M01281472-P2: Remove fixtures, equipment and piping and restore existing drains in first floor kitchen and locker room. New underslab drainage and grease interceptor for prep kitchen fit-out. Gas piping modification.
M01281472-P3: Remove fixtures, equipment and piping and restore existing drains in first floor kitchen and locker room. New underslab drainage and grease interceptor for prep kitchen fit-out. Gas piping modification.
M01281472-P4: Remove fixtures, equipment and piping and restore existing drains in first floor kitchen and locker room. New underslab drainage and grease interceptor for prep kitchen fit-out. Gas piping modification.
M01281472-S2: Remove fixtures, equipment and piping and restore existing drains in first floor kitchen and locker room. New underslab drainage and grease interceptor for prep kitchen fit-out. Gas piping modification.
M01281472-S4: Concrete topping slab and slab on grade replacement for plumbing trenching
M01281472-S3: Relocate existing sprinkler heads for ceiling modifications on first floor
Status timeline
- Nov 12, 2025 — New job filed (Permit Entire) M01281472-I1
- Nov 12, 2025 — New job filed (Permit Entire) M01281472-S2
- Nov 12, 2025 — New job filed (Permit Entire) M01281472-S3
- Nov 12, 2025 — New job filed (Permit Entire) M01281472-S4
- Nov 13, 2025 — New job filed (Permit Entire) M01281472-S1
- Nov 20, 2025 — Permit issued — work can start (Permit Entire) M01281472-I1
- Nov 20, 2025 — Permit issued — work can start (Permit Entire) M01281472-S4
- Nov 20, 2025 — Permit issued — work can start (Permit Entire) M01281472-S1
- Jan 16, 2026 — Permit issued — work can start (Permit Entire) M01281472-S3
- Jan 19, 2026 — Permit issued — work can start (Plumbing) M01281472-S2
- Jun 7, 2026 — New job filed (Approved) M01281472-P2
- Jun 9, 2026 — Plans approved (Approved) M01281472-P2
- Sep 24, 2026 — New job filed (Approved) M01281472-P3
- Sep 29, 2026 — Plans approved (Approved) M01281472-P3
- Oct 8, 2026 — New job filed (Approved) M01281472-P4
- Oct 13, 2026 — Plans approved (Approved) M01281472-P4
- Oct 13, 2026 — Permit issued — work can start (Permit Entire) M01281472-S2
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01281472-S2-PL | Plumbing | Permit Issued | Jan 19, 2026 | Jan 20, 2027 |
| M01281472-S3-EW-SP | Sprinklers | Signed-off | Jan 15, 2026 | Jan 16, 2027 |
| M01281472-I1-GC | General Construction | Signed-off | Nov 19, 2025 | Nov 1, 2026 |
| M01281472-S1-MS | Mechanical Systems | Signed-off | Nov 19, 2025 | Nov 1, 2026 |
| M01281472-S4-ST | Structural | Signed-off | Nov 19, 2025 | Nov 1, 2026 |