Neighborhoods › Midtown-Times Square › Building 1024748
Facade/scaffold work: Installation of temporary pipe scaffold as per plan. no…, est. $1K
268 West 47 Street, Manhattan 11550 · Approved
| Job | M01272415 (6 filings: P1, P2, P3, P4, P5, S2) · Alteration |
|---|---|
| Category | facade/scaffold |
| Estimated cost | $1,000 |
| Work types | Scaffold |
| Filed | Oct 21, 2025 |
| Professional | Wellworth Consulting Llc |
| Building | BIN 1024748 · BBL 1010180061 |
| Official record | DOB NOW job M01272415 |
DOB description
M01272415-P1: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD TOP OF THE SIDEWALK SHED OAST THE MAIN ROOF PARAPET WALL ON THE NORTH AND WEST ELEVATIONS.
M01272415-P2: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD TOP OF THE SIDEWALK SHED OAST THE MAIN ROOF PARAPET WALL ON THE NORTH AND WEST ELEVATIONS.
M01272415-P3: INSTALLATION OF TEMPORARY SHORING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. TEMPORARY SHORING INSTALLED AT THE 3RD FLOOR EXTENDING TO THE UNDERSIDE OF THE ROOF, BENEATH EXISTING BEAMS AND JOISTS, INCLUDING AREAS ADJACENT TO THE ELEVATOR SHAFT.
M01272415-P4: INSTALLATION OF TEMPORARY SHORING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. TEMPORARY SHORING INSTALLED AT THE 3RD FLOOR EXTENDING TO THE UNDERSIDE OF THE ROOF, BENEATH EXISTING BEAMS AND JOISTS, INCLUDING AREAS ADJACENT TO THE ELEVATOR SHAFT.
M01272415-P5: INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLAN. NO CHANGE IN USE, EGRESS, OR OCCUPANCY. THE PIPE SCAFFOLD TOP OF THE SIDEWALK SHED OAST THE MAIN ROOF PARAPET WALL ON THE NORTH AND WEST ELEVATIONS.
M01272415-S2: INSTALLATION OF TEMPORARY SHORING AS PER PLAN. NO CHANGE IN USE, EGRESS OR OCCUPANCY. TEMPORARY SHORING INSTALLED AT THE 3RD FLOOR EXTENDING TO THE UNDERSIDE OF THE ROOF, BENEATH EXISTING BEAMS AND JOISTS, INCLUDING AREAS ADJACENT TO THE ELEVATOR SHAFT.
Status timeline
- Oct 21, 2025 — New job filed (Approved) M01272415-P1
- Oct 24, 2025 — Plans approved (Approved) M01272415-P1
- Dec 28, 2025 — New job filed (Permit Entire) M01272415-S2
- Dec 28, 2025 — Permit issued — work can start (Protection and Mechanical Methods) M01272415-S2
- Jan 19, 2026 — New job filed (Approved) M01272415-P2
- Jan 26, 2026 — Plans approved (Approved) M01272415-P2
- Apr 29, 2026 — New job filed (Approved) M01272415-P3
- May 1, 2026 — Plans approved (Approved) M01272415-P3
- May 13, 2026 — New job filed (Approved) M01272415-P4
- May 15, 2026 — Plans approved (Approved) M01272415-P4
- May 15, 2026 — Permit issued — work can start (Permit Entire) M01272415-S2
- Jun 29, 2026 — New job filed (Approved) M01272415-P5
- Jul 1, 2026 — Plans approved (Approved) M01272415-P5
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01272415-I1-SH | Sidewalk Shed | Permit Issued | Aug 30, 2026 | Nov 28, 2026 |
| M01272415-S1-SF | Supported Scaffold | Permit Issued | Aug 30, 2026 | Feb 28, 2027 |
| M01272415-S2-PMM | Protection and Mechanical Methods | Permit Issued | Dec 28, 2025 | Dec 29, 2026 |