Neighborhoods › Harlem (North) › Building 1086074
Mechanical/plumbing work: The scope of work shall consist of a new sanitary…, est. $5.1M
159-38 Harlem River Drive, Manhattan 11501 · Approved
| Job | M01272000 (7 filings: P2, S4, P1, S3, P3, S5, S1) · Alteration |
|---|---|
| Category | mechanical/plumbing |
| Estimated cost | $5,115,510 |
| Scale | 14 → 14 stories; 112 → 112 dwelling units; 96,856 sq ft |
| Work types | Plumbing |
| Filed | Sep 22, 2026 |
| Professional | Emtg Consultants Inc |
| Building | BIN 1086074 · BBL 1021060320 |
| Official record | DOB NOW job M01272000 |
DOB description
M01272000-P2: THE SCOPE OF WORK SHALL CONSIST OF A NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT, AND NATURAL GAS PIPING SYSTEMS TO BE INSTALLED THROUGHOUT AN EXISTING R-2 BUILDING UNDERGOING A REHABILITATION PROJECT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01272000-S4: THE SCOPE OF WORK SHALL CONSIST OF A NEW SANITARY, STORM, DOMESTIC WATER, SANITARY VENT, AND NATURAL GAS PIPING SYSTEMS TO BE INSTALLED THROUGHOUT AN EXISTING R-2 BUILDING UNDERGOING A REHABILITATION PROJECT. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01272000-P1: Moderate rehabilitation of existing 14-story multi-family building. Removal and asbestos abatement of existing windows, exterior residential front entry storefront, and all UFAS apartment flooring affected by change. No change in use, egress and occupancy
M01272000-S3: Moderate rehabilitation of existing 14-story multi-family building. Removal and asbestos abatement of existing windows, exterior residential front entry storefront, and all UFAS apartment flooring affected by change. No change in use, egress and occupancy
M01272000-P3: MECHANICAL WORK FILED IN CONJUNCTION WITH THE GC APPLICATION. WORK TO INCLUDE NEW AC SYSTEM AND ALL ASSOCIATED PIPING AND DUCTWORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01272000-S5: MECHANICAL WORK FILED IN CONJUNCTION WITH THE GC APPLICATION. WORK TO INCLUDE NEW AC SYSTEM AND ALL ASSOCIATED PIPING AND DUCTWORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01272000-S1: REPAIR OF SLAB CRACKS AND SPALLS. REPAIR OF STAIR LANDING SPANDREL. NEW DUNNAGE ON ROOF TO SUPPORT MEP EQUIPMENT. REPAIR OF CONCRETE BEAM AND COLUMN IN ROOF BULKHEAD.
Status timeline
- May 25, 2026 — New job filed (Approved) M01272000-S4
- May 27, 2026 — New job filed (Approved) M01272000-S1
- May 27, 2026 — New job filed (Approved) M01272000-S5
- May 29, 2026 — Plans approved (Approved) M01272000-S1
- Jun 16, 2026 — New job filed (Approved) M01272000-S3
- Jul 30, 2026 — New job filed (Approved) M01272000-P1
- Aug 3, 2026 — Plans approved (Approved) M01272000-P1
- Aug 3, 2026 — Plans approved (Approved) M01272000-S3
- Sep 22, 2026 — New job filed (Approved) M01272000-P2
- Sep 24, 2026 — New job filed (Approved) M01272000-P3
- Sep 30, 2026 — Plans approved (Approved) M01272000-P3
- Sep 30, 2026 — Plans approved (Approved) M01272000-S5
- Oct 5, 2026 — Plans approved (Approved) M01272000-P2
- Oct 5, 2026 — Plans approved (Approved) M01272000-S4
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01272000-S2-GC | General Construction | Permit Issued | Aug 20, 2026 | Nov 4, 2026 |
| M01272000-I1-GC | General Construction | Permit Issued | Jun 4, 2026 | Nov 30, 2026 |