NYC Permit AlertsBy BuildPermitGuide

Neighborhoods › Financial District-Battery Park City › Building 1089805

Interior renovation: Reach 4 - new flood wall construction per bpcr project.…, est. $42M

401 South End Avenue, Manhattan 10279 · Approved

JobM01249540 (4 filings: I1, S1, S2, S3) · Alteration
Categoryinterior renovation
Estimated cost$41,553,401
Scale1 → 1 stories; 27,300 sq ft
Work typesGeneral Construction, Earthwork
FiledDec 4, 2025
ProfessionalArcadis of New York, Inc.
BuildingBIN 1089805 · BBL 1000160003
Official recordDOB NOW job M01249540

DOB description

M01249540-I1: REACH 4 - New flood wall construction per BPCR Project. Scope includes excavation, grading, landscaping, soil improvement, utility and drainage upgrades, fill placement, and foundation stabilization. See G-004.00. No change to use, egress or occupancy.
M01249540-S1: Reach 4 - FBS includes elevated platform with precast decks, cast-in-place slabs/beams, floodwall to EL 16.5' on drilled shafts, roller gates, pipe-pile barrier, micropile T-wall, and seawall for wave dissipation. No change to use, egress or occupancy.
M01249540-S2: Reach 4 - Support of excavation - Construction of flood barrier system for the BPCA North/West Battery Park City Resiliency Project. No change to use, egress, or occupancy.
M01249540-S3: Reach 4 - scope includes (4) 12" watermain relocations, (3) valves, (1) fire hydrant with 6" lead. Replacing a 96" CSO chamber with a tide gate, relocating sewers, and installing drains, manholes, and pavers. No change to use, egress or occupancy.

Status timeline

Map

Watch this block

Get an email when the next job is filed within 100 ft of this address. Free, weekly.