Neighborhoods › Upper West Side-Manhattan Valley › Building 1057317
Interior renovation: General construction to renovate apt 7a on the 7th…, est. $125K
610 West 110 Street, Manhattan 11361 · LOC Issued
| Job | M01244092 (4 filings: I1, P1, P2, S1) · Alteration |
|---|---|
| Category | interior renovation |
| Estimated cost | $125,010 |
| Scale | 14 → 14 stories; 73 → 73 dwelling units; 1,278 sq ft |
| Work types | General Construction |
| Filed | Oct 28, 2025 |
| Professional | Sustainable Design Engineering Pllc |
| Building | BIN 1057317 · BBL 1018937502 |
| Official record | DOB NOW job M01244092 |
DOB description
M01244092-I1: GENERAL CONSTRUCTION TO RENOVATE APT 7A ON THE 7TH FLOOR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M01244092-P1: GENERAL CONSTRUCTION TO RENOVATE APT 7A ON THE 7TH FLOOR. WORK WILL INCLUDE NEW PARTITIONS & FINISHES, AND NEW PLUMBING FIXTURES. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS FILING.
M01244092-P2: RELOCATE PLUMBING FIXTURES WITH NEW (2 WC, 1 LAV, 1 SINK) AND INSTALL NEW PLUMBING FIXTURES AT NEW ROUGHING (2 SHOWER, 1 LAV, 1 DW, 1 W/M) AT APT 7A ON THE 7TH FLOOR.
M01244092-S1: RELOCATE PLUMBING FIXTURES WITH NEW (2 WC, 1 LAV, 1 SINK) AND INSTALL NEW PLUMBING FIXTURES AT NEW ROUGHING (2 SHOWER, 1 LAV, 1 DW, 1 W/M) AT APT 7A ON THE 7TH FLOOR.
Status timeline
- Oct 28, 2025 — New job filed (LOC Issued) M01244092-I1
- Oct 28, 2025 — New job filed (LOC Issued) M01244092-S1
- Jan 25, 2026 — New job filed (Approved) M01244092-P1
- Jan 25, 2026 — New job filed (Approved) M01244092-P2
- Jan 27, 2026 — Plans approved (Approved) M01244092-P1
- Jan 27, 2026 — Plans approved (Approved) M01244092-P2
- Aug 4, 2026 — Job signed off (LOC Issued) M01244092-S1
- Aug 6, 2026 — Job signed off (LOC Issued) M01244092-I1
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01244092-S1-PL | Plumbing | Signed-off | Dec 25, 2025 | Oct 4, 2026 |
| M01244092-I1-GC | General Construction | Signed-off | Nov 9, 2025 | Jul 24, 2026 |
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.