NYC Permit AlertsBy BuildPermitGuide

Neighborhoods › Midtown-Times Square › Building 1083719

Interior renovation: General construction to take place on the 29th floor as…, est. $3.3M

1345 6 Avenue, Manhattan 10019 · Approved

JobM01237237 (5 filings: P1, P2, P5, P4, P3) · Alteration
Categoryinterior renovation
Estimated cost$3,291,242
Scale49 → 49 stories; 41,739 sq ft
Work typesGeneral Construction
FiledJul 6, 2026
ProfessionalGensler
BuildingBIN 1083719 · BBL 1010070029
Official recordDOB NOW job M01237237

DOB description

M01237237-P1: General Construction to take place on the 29th floor as per plans filed. (30th floor Marketing) No change in use, egress, or occupancy.
M01237237-P2: Mechanical modifications to take place on the 29th floor per drawings filed herewith. (30th floor Marketing) No change in use, egress, or occupancy.
M01237237-P5: Mechanical modifications to take place on the 29th floor per drawings filed herewith. (30th floor Marketing) No change in use, egress, or occupancy.
M01237237-P4: Structural modifications taking place on the 29th- 30th floors (30th - 31st Marketing floors) as indicated on the drawings.
M01237237-P3: Sprinkler modifications on 29th floor as per drawings filed herewith. (30th floor Marketing) No change in use, egress, or occupancy.

Status timeline

Work permits

PermitWorkStatusIssuedExpires
M01237237-S3-EW-SPSprinklersSigned-offAug 11, 2026Nov 4, 2026
M01237237-S4-STStructuralSigned-offJul 15, 2026Apr 19, 2027
M01237237-I1-GCGeneral ConstructionPermit IssuedJul 14, 2026Apr 19, 2027
M01237237-S1-MSMechanical SystemsSigned-offJul 14, 2026Apr 19, 2027

Map

Watch this block

Get an email when the next job is filed within 100 ft of this address. Free, weekly.