NYC Permit AlertsBy BuildPermitGuide

Neighborhoods › Midtown-Times Square › Building 1083719

Interior renovation: General construction to take place on the 16th floor as…, est. $5.4M

1345 6 Avenue, Manhattan 10019 · Approved

JobM01237236 (5 filings: P2, P3, P5, P1, P4) · Alteration
Categoryinterior renovation
Estimated cost$5,372,895
Scale49 → 49 stories; 41,787 sq ft
Work typesGeneral Construction
FiledJul 5, 2026
ProfessionalGensler
BuildingBIN 1083719 · BBL 1010070029
Official recordDOB NOW job M01237236

DOB description

M01237236-P2: General Construction to take place on the 16th floor as per plans filed. No change in use, egress, or occupancy.
M01237236-P3: Mechanical modifications on 16th floor as per drawings filed. No change in use, egress, or occupancy.
M01237236-P5: Structural modifications taking place on the 16th - 17th floors as indicated on the drawings.
M01237236-P1: Plumbing modifications on 16th floor as per drawings filed. No change in use, egress, or occupancy.
M01237236-P4: Sprinkler modifications on 16th floor as per drawings filed. No change in use, egress, or occupancy.

Status timeline

Work permits

PermitWorkStatusIssuedExpires
M01237236-S3-EW-SPSprinklersPermit IssuedJul 23, 2026Mar 1, 2027
M01237236-I1-GCGeneral ConstructionPermit IssuedJul 15, 2026Apr 19, 2027
M01237236-S4-STStructuralSigned-offJul 15, 2026Apr 19, 2027
M01237236-S1-MSMechanical SystemsSigned-offJul 14, 2026Apr 19, 2027

Map

Watch this block

Get an email when the next job is filed within 100 ft of this address. Free, weekly.