NYC Permit AlertsBy BuildPermitGuide

Neighborhoods › Midtown-Times Square › Building 1083719

Interior renovation: General construction to take place on the 14th floor as…, est. $7.9M

1345 6 Avenue, Manhattan 10019 · Approved

JobM01237218 (6 filings: P3, P1, P4, P2, P6, P5) · Alteration
Categoryinterior renovation
Estimated cost$7,932,212
Scale49 → 49 stories; 40,210 sq ft
Work typesGeneral Construction
FiledJun 21, 2026
ProfessionalGensler
BuildingBIN 1083719 · BBL 1010070029
Official recordDOB NOW job M01237218

DOB description

M01237218-P3: General Construction to take place on the 14th floor as per plans filed. No change in use, egress, or occupancy.
M01237218-P1: Mechanical modifications including corporate kitchen ventilation system for Paul Weiss on the 14th floor as per drawings filed herewith. No change in use, egress, or occupancy.
M01237218-P4: Mechanical modifications including corporate kitchen ventilation system for Paul Weiss on the 14th floor as per drawings filed herewith. No change in use, egress, or occupancy.
M01237218-P2: Plumbing modifications on 13-14th floors as per drawings filed. No change in use, egress, or occupancy.
M01237218-P6: Structural modifications taking place on the 14t-15th floors as indicated on the drawings.
M01237218-P5: Sprinkler modifications to take place on the 14th floor as per drawings filed herewith. No change in use, egress, or occupancy.

Status timeline

Work permits

PermitWorkStatusIssuedExpires
M01237218-S3-EW-SPSprinklersPermit IssuedJul 23, 2026Mar 1, 2027
M01237218-S4-STStructuralSigned-offJul 15, 2026Apr 19, 2027
M01237218-S1-MSMechanical SystemsSigned-offJul 14, 2026Apr 19, 2027
M01237218-I1-GCGeneral ConstructionPermit IssuedJul 7, 2026Apr 19, 2027

Map

Watch this block

Get an email when the next job is filed within 100 ft of this address. Free, weekly.