Neighborhoods › West Village › Building 1010417
Facade/scaffold work: 9th cycle fisp repair. no change to use egress or…, est. $96K
180 Christopher Street, Manhattan 10001 · Permit Entire
| Job | M01219510 (2 filings: I1, S1) · Alteration |
|---|---|
| Category | facade/scaffold |
| Estimated cost | $96,024 |
| Scale | 6 → 6 stories; 46 → 46 dwelling units; 1,545 sq ft |
| Work types | General Construction |
| Filed | Dec 29, 2025 |
| Professional | Rand Engineering & Architecture |
| Building | BIN 1010417 · BBL 1006040003 |
| Official record | DOB NOW job M01219510 |
DOB description
M01219510-I1: 9th Cycle FISP Repair. No Change to Use Egress or Occupancy.
M01219510-S1: installation of heavy duty sidewalk shed. no change in use, occupancy or egress. all work to comply with chapter 33 of nycbc
Status timeline
- Dec 29, 2025 — New job filed (Permit Entire) M01219510-I1
- Apr 28, 2026 — Permit issued — work can start (General Construction) M01219510-I1
- Apr 29, 2026 — Permit issued — work can start (Permit Entire) M01219510-I1
- Sep 10, 2026 — New job filed (Permit Entire) M01219510-S1
- Sep 10, 2026 — Permit issued — work can start (Sidewalk Shed) M01219510-S1
- Sep 11, 2026 — Permit issued — work can start (Permit Entire) M01219510-S1
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01219510-S1-SH | Sidewalk Shed | Permit Issued | Sep 10, 2026 | Dec 9, 2026 |
| M01219510-I1-GC | General Construction | Permit Issued | Apr 28, 2026 | Mar 31, 2027 |
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.