NYC Permit AlertsBy BuildPermitGuide

Neighborhoods › East Midtown-Turtle Bay › Building 1081185

Mechanical/plumbing work: As approved by borough commissioner john raine, we…, est. $1K

825 Third Avenue, Manhattan 10018 · LOC Issued

JobM01218400 (2 filings: S2, S3) · Alteration
Categorymechanical/plumbing
Estimated cost$1,000
Work typesMechanical
FiledApr 30, 2026
ProfessionalMe Engineers
BuildingBIN 1081185 · BBL 1013240001
Official recordDOB NOW job M01218400

DOB description

M01218400-S2: As approved by Borough Commissioner John Raine, we are filing an EMERGENCY GENERATOR ORIGINALLY PERMITTED AND INSTALLED UNDER INADVERTENTLY WITHDRAWN ALT 2 #100410878 MH WORK TYPE, TO SHOW EXISTING CONDITIONS APPROVED AND INSTALLED UNDER SUCH application.
M01218400-S3: This subsequent filing is being submitted solely to include and identify the 300 gallon day tank within the approved scope of work. There are no revisions, modifications, or changes to the plans previously filed and approved under Filing M01218400-I1.

Status timeline

Work permits

PermitWorkStatusIssuedExpires
M01218400-S2-MSMechanical SystemsSigned-offJul 19, 2026Dec 30, 2026
M01218400-I1-BEBoiler EquipmentSigned-offJul 12, 2026Apr 30, 2027
M01218400-S3-BEBoiler EquipmentSigned-offJul 12, 2026Apr 30, 2027

Map

Watch this block

Get an email when the next job is filed within 100 ft of this address. Free, weekly.