Neighborhoods › East Midtown-Turtle Bay › Building 1036525
Interior renovation: Renovate ex. suites # 401 & 402 @ 4th floor and suite…, est. $298K
160 East 56 Street, Manhattan 11729 · Approved
| Job | M01051059 (8 filings: P7, P8, P5, P6, S4, P9, S3, S5) · Alteration CO |
|---|---|
| Category | interior renovation |
| Estimated cost | $297,850 |
| Scale | 12 → 12 stories; 5,957 sq ft |
| Work types | General Construction |
| Filed | Mar 19, 2026 |
| Professional | Bernard Ocasio Architect, P.C. |
| Building | BIN 1036525 · BBL 1013100041 |
| Official record | DOB NOW job M01051059 |
DOB description
M01051059-P7: RENOVATE EX. SUITES # 401 & 402 @ 4th FLOOR AND SUITE 100 @ 10TH FL. WITH NEW NON-BEARING PARTITIONS,NEW PARTITIONS, FLOORING, CABINETRY, DOORS AND CEILING AS PER PLANS FILED. OBTAIN AMENDED C of O TO CHANGE USE FROM SHOWROOM AND FACTORY TO OFFICES UG VII
M01051059-P8: RENOVATE EX. SUITES # 401 & 402 @ 4th FLOOR AND SUITE 100 @ 10TH FL. WITH NEW NON-BEARING PARTITIONS,NEW PARTITIONS, FLOORING, CABINETRY, DOORS AND CEILING AS PER PLANS FILED. OBTAIN AMENDED C of O TO CHANGE USE FROM SHOWROOM AND FACTORY TO OFFICES UG VII
M01051059-P5: RENOVATE EXISITNG SUITES # 401 & 402 AT THE 4th FLOOR WITH NEW NON-BEARING PARTITIONS, NEW PARTITIONS, FLOORING, CABINETRY, DOORS AND CEILING AS PER PLANS FILED. OBTAIN AMENDED C of O TO CHANGE USE FROM SHOWROOM AND FACTORY TO OFFICES UG VII.
M01051059-P6: RENOVATE EXISITNG SUITES # 401 & 402 AT THE 4th FLOOR WITH NEW NON-BEARING PARTITIONS, NEW PARTITIONS, FLOORING, CABINETRY, DOORS AND CEILING AS PER PLANS FILED. OBTAIN AMENDED C of O TO CHANGE USE FROM SHOWROOM AND FACTORY TO OFFICES UG VII.
M01051059-S4: INSTALLATION OF NEW VRF UNITS WITH ASSOCIATED DUCTWORK AND PPIIPNG SERVING 10TH FLOOR.
M01051059-P9: RENOVATE ENTIRE 10th FLOOR BY REMOVING EXISTING PLUMBING FIXTURES AND INSTALLING NEW AND ALSO REPLACE, RELOCATE AND CAP & SEAL AS PER PLANS FIILED.
M01051059-S3: RENOVATE ENTIRE 10th FLOOR BY REMOVING EXISTING PLUMBING FIXTURES AND INSTALLING NEW AND ALSO REPLACE, RELOCATE AND CAP & SEAL AS PER PLANS FIILED.
M01051059-S5: MODIFICATION OF THE EXISTING WET TYPE SPRINKLER SYSTEM AT 10th FLOOR.
Status timeline
- Nov 17, 2025 — New job filed (Approved) M01051059-P5
- Dec 6, 2025 — Plans approved (Approved) M01051059-P5
- Dec 18, 2025 — New job filed (Approved) M01051059-P6
- Jan 30, 2026 — Plans approved (Approved) M01051059-P6
- Mar 19, 2026 — New job filed (Approved) M01051059-P7
- Mar 27, 2026 — New job filed (Permit Entire) M01051059-S3
- Apr 24, 2026 — Plans approved (Approved) M01051059-P7
- Aug 16, 2026 — New job filed (Plan Examiner Review) M01051059-P8
- Aug 16, 2026 — New job filed (Approved) M01051059-P9
- Sep 7, 2026 — Permit issued — work can start (Plumbing) M01051059-S3
- Sep 8, 2026 — Plans approved (Approved) M01051059-P9
- Sep 8, 2026 — Permit issued — work can start (Permit Entire) M01051059-S3
- Sep 8, 2026 — New job filed (Objections) M01051059-S4
- Sep 8, 2026 — New job filed (Objections) M01051059-S5
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01051059-S3-PL | Plumbing | Permit Issued | Sep 7, 2026 | Apr 4, 2027 |
| M01051059-I1-GC | General Construction | Permit Issued | Apr 23, 2026 | Jun 30, 2027 |