Neighborhoods › East Harlem (North) › Building 1054156
Mechanical/plumbing work: Installation of modular air cooled heat pump…, est. $11M
2005 Madison Avenue, Manhattan 07058 · Approved
| Job | M01024451 (7 filings: P1, P4, P6, A1, P3, P5, P2) · Alteration |
|---|---|
| Category | mechanical/plumbing |
| Estimated cost | $10,936,215 |
| Work types | Mechanical |
| Filed | Nov 17, 2025 |
| Professional | Shenoy Engineering, Pc |
| Building | BIN 1054156 · BBL 1017520022 |
| Official record | DOB NOW job M01024451 |
DOB description
M01024451-P1: Installation of modular air cooled heat pump chillers & electric hot water boiler system. Installation of split system air-cooled heat pump systems and refrigerant systems. Replacement of exhaust fans, unit ventilators, and packaged heat pump units.
M01024451-P4: Create window openings on building facade & provide new windows. Remove & reinstall face brick at window openings. Create skylight openings in roof slab. Replace ceilings and create openings in walls with MH work. Remove walls in cellar & repair VCT areas
M01024451-P6: Create window openings on building facade & provide new windows. Remove & reinstall face brick at window openings. Create skylight openings in roof slab. Replace ceilings and create openings in walls with MH work. Remove walls in cellar & repair VCT areas
M01024451-A1: Remove & replace entire existing sprinkler system, piping, & associated supports. Provide sprinkler booster pump, jockey pump with all accessories, valves, controls, supports and pump test header.
M01024451-P3: Remove & replace entire existing sprinkler system, piping, & associated supports. Provide sprinkler booster pump, jockey pump with all accessories, valves, controls, supports and pump test header.
M01024451-P5: Structural work for this building electrification project includes new dunnage for rooftop MEP equipment, new roof openings for skylights, and infill of extents of existing slab at existing fuel oil tank room in cellar.
M01024451-P2: Remove all gas piping & equipment, & disconnect gas service. Remove 2 existing steam hot water exchangers & abandoned gas water heater. Add temp water heater prior to phasing. Add water heater, sump pump, drinking fountain, & secondary RPZ. Replace 2 FD's
Status timeline
- Nov 17, 2025 — New job filed (Approved) M01024451-P1
- Nov 17, 2025 — New job filed (Approved) M01024451-P2
- Nov 17, 2025 — New job filed (Approved) M01024451-P3
- Nov 18, 2025 — New job filed (Approved) M01024451-P5
- Nov 22, 2025 — New job filed (Approved) M01024451-P4
- Dec 5, 2025 — Plans approved (Approved) M01024451-P1
- Dec 5, 2025 — Plans approved (Approved) M01024451-P2
- Dec 29, 2025 — Plans approved (Approved) M01024451-P3
- Feb 27, 2026 — Plans approved (Approved) M01024451-P4
- Feb 27, 2026 — Plans approved (Approved) M01024451-P5
- Mar 4, 2026 — New job filed (Approved) M01024451-P6
- Mar 30, 2026 — Plans approved (Approved) M01024451-P6
- Sep 23, 2026 — New job filed (Objections) M01024451-A1
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M01024451-S2-EW-SP | Sprinklers | Permit Issued | May 12, 2026 | Apr 1, 2027 |
| M01024451-S4-ST | Structural | Permit Issued | Nov 11, 2025 | Nov 12, 2026 |
| M01024451-I1-MS | Mechanical Systems | Permit Issued | Nov 6, 2025 | Dec 26, 2026 |
| M01024451-S1-PL | Plumbing | Permit Issued | Nov 6, 2025 | Nov 7, 2026 |
| M01024451-S3-GC | General Construction | Permit Issued | Nov 6, 2025 | Nov 7, 2026 |