Neighborhoods › Washington Heights (South) › Building 1062991
Interior renovation: As per hub consultation. the expansion project will be…, est. $130M
1150 St Nicholas Avenue, Manhattan 10036 · Approved
| Job | M00966646 (4 filings: P1, P4, P2, P3) · Alteration CO |
|---|---|
| Category | interior renovation |
| Estimated cost | $129,950,554 |
| Scale | 9 → 9 stories; 76,075 sq ft |
| Work types | General Construction |
| Filed | Mar 24, 2026 |
| Professional | Kohn Pedersen Fox |
| Building | BIN 1062991 · BBL 1021240035 |
| Official record | DOB NOW job M00966646 |
DOB description
M00966646-P1: As per HUB consultation. The expansion project will be designed & classified as an addition to the existing RBSP & will be 9 storiesin height w/ approximately 75,000 sf of NB area. The expansion will have direct connections to the RBSP for egress.
M00966646-P4: NEW CENTRAL AHU SYS W/ LOCAL FLOW & TEMPERATURECONTROL. NEW SP LAYOUT SHALL BE FROM EXISTING FIRE PUMP SYS.NEW FA DEVICES THROUGHOOUT THE BLDING TIED INTO EXISTING FA SYS. MODIFICATION TO EXISTING STORM DETENTION SYS. NEW DEDICATED GENERATOR&FUEL OIL SYS
M00966646-P2: the work is a 7 story concrete academic laboratory building with 2 levels of steel MEP mezzanine at the roof level sitting above an existing concrete basement.
M00966646-P3: PLUMBING WORK ASSOCIATED WITH THE FITOUT OF THE BERRIEBUILDING EXPANSION
Status timeline
- Mar 24, 2026 — New job filed (Approved) M00966646-P1
- Mar 31, 2026 — New job filed (Approved) M00966646-P2
- Apr 9, 2026 — New job filed (Approved) M00966646-P4
- Apr 12, 2026 — Plans approved (Approved) M00966646-P2
- Apr 12, 2026 — New job filed (Approved) M00966646-P3
- Apr 24, 2026 — Plans approved (Approved) M00966646-P3
- Apr 24, 2026 — Plans approved (Approved) M00966646-P4
- May 17, 2026 — Plans approved (Approved) M00966646-P1
Work permits
| Permit | Work | Status | Issued | Expires |
|---|---|---|---|---|
| M00966646-I1-GC | General Construction | Permit Issued | Dec 28, 2025 | Dec 11, 2026 |
| M00966646-S3-PL | Plumbing | Signed-off | Dec 1, 2025 | Dec 9, 2026 |
Watch this block
Get an email when the next job is filed within 100 ft of this address. Free, weekly.