NYC Permit AlertsBy BuildPermitGuide

Neighborhoods › Flatbush › Building 3327317

Full demolition of 5-story building, est. $5.5M

2955 Bedford Avenue, Brooklyn 10036 · Approved

JobB01428407 (5 filings: I1, S1, S2, S4, S3) · Alteration
Categorydemolition
Estimated cost$5,505,045
Scale5 → 5 stories; 6,734 sq ft
Work typesGeneral Construction
FiledAug 25, 2026
ProfessionalMitchell / Giurgola Architects
BuildingBIN 3327317 · BBL 3075560150
Official recordDOB NOW job B01428407

DOB description

B01428407-I1: Demolition of non-load-bearing partitions, doors, casework, ceilings, and finishes at partial areas of the 1st, 2nd, 3rd, and 4th, and 5th floors, as indicated on plans filed herewith. No change in use, egress, or occupancy.
B01428407-S1: Demolition of existing mechanical systems and associated equipment at basement thru 5th floors and penthouse in preparation for future renovation. No change in use, egress or occupancy.
B01428407-S2: Demolition of existing plumbing fixtures, lab stations, fume hoods and associated piping at basement, 1st, 3rd and 4th floors in preparation for future renovation. No change in use, egress or occupancy.
B01428407-S4: Structural modifications as shown on plans filed herewith. No change in egress, occupancy or use.
B01428407-S3: Installation of new wet sprinkler system: new sprinkler heads, branch piping, new booster and jockey pumps w/ controllers, tied into existing risers/mains to remain. No change in egress, occupancy or use.

Status timeline

Map

Watch this block

Get an email when the next job is filed within 100 ft of this address. Free, weekly.